F.D. Francisco_CV. 05.Apr.2023 1/8
1. Full name : FREDERICK DELGADO FRANCISCO
2. Provincial Address : Purok 7, Laurente Street, Barangay Poblacion, Bislig City
Surigao Del Sur, Philippines zc: 8311
3. Years with Industry : 30 years++
4. Nationality/ Religion : Filipino / Roman Catholic; Christian (B.A.)
5. Birth Date / Place : September 14, 1968 / Davao City, Philippines
6. Detailed Tasks Assigned :
Prepares Architectural, MEPF Designs, Shop Drawings and As-built
Project Management & Direct Supervision of MEPF Construction Site Works
Prepares HVAC, Plumbing & Fire Protection Materials Estimate (BOQ)
Computer Applications:
AutoDesk (BIM) Rivet_r2014
AutoDesk Naviswork_r2014
AutoCAD Application (Rel.14 – Rel. 2014)
AutoDesk Showcase
Windows MS Word 2003 – 2013 Applct’n.
Windows Excel 2003 -2013 Application
7. EMPLOYMENT RECORDS:
a) Company : Sanyo Engineering & Construction Inc. (SEC
BANGLADESH)
Venture Tower, 6 th floor, Plot-3, Bir Uttam A.K Khandakar
Road
Mohakhali C/A, Dhaka-1212, Bangladesh
Tel : +880-2-222263361 & 2 Fax : +880-2-222283360
Position : Manager / Project Section
Year : 01, March 2018 to Present
PROJECTS UNDERTAKEN :
Pakistan Institute of Medical Science (PIMS)
PJ Assistant in Islamabad
YKK P-3;AC Rehabilitation PJ-Design & Estimate Works-
Dhaka, Bangladesh
HONDA FACTORY Ph-2_MEP Design & Estimate Works-
Dhaka, Bangladesh
EMBASSY Of JAPAN Contruction_PJAssistant in (PNG)
Papua New Guinea
SHIP AICHI HOSPITAL– PJ Supervision & Consultant Dhaka,
Bangladesh
HONDA FACTORY-PJ Supervisiion & Consultant_Bangladesh
NAKANO Fty. AC Rehabilitation PJ-Design & Estimate
Bangladesh
b) Company : Sanyo Engineering & Construction Inc. (SEC THAILAND)
For YKK FACTORY-2 PROJECT, Dhaka BANGLADESH
Position : Asst. Project Manager/ Mechanical Project Division
Year : 12, May 2016 to 01, March 2018
Contact No. +639669763274 / +880-1302699387 / +880-
1759029110 / +880-1325661764 / +061-03098883989
Email Address : frederick68@secbangla.com
frederickfrancisco091468.ff@gmail.com
Passport No: P5398472B (12-08-2020 to 11-08-2030)
F.D. Francisco_CV. 05.Apr.2023 2/8
PROJECTS UNDERTAKEN :
YKK FACTORY-2, Construction Project
Savar Economic Zone, Dhaka Bangladesh
DUTIES AND RESPONSIBILITIES:
Project Design & Schedule dissemination to Site Engineer &
Supervisor
Attending construction coordination meeting
Direct Site supervision of MEPF works
Check of works performed in accordance with plans,
specifications & International Standard
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare MEPF materials take-off.
Weight Load Calculation of MEPF Materials, System Elements
& Equipment as required by Building Construction Consultant.
Preparation of Shop Drawings, Design plans and as-built
drawings using Auto Cad Program
c) Company : Sanyo Engineering & Construction Inc. (SEC MALAYSIA)
For JAKARTA INDONESIA PROJECT
Position : Chief Coordinator/ Mechanical Project Division
Year : 01 August 2015 to 01 March 2016
PROJECTS UNDERTAKEN :
MENARA ASTRA CORPORATE OFFICE TOWER
BUILDING Construction
Project
Jakarta lndonesia. Jenderal Sudirman No.Kav 5-6
DUTIES AND RESPONSIBILITIES:
Attending construction coordination meeting
Direct Site supervision of MEPF works
Check of works performed in accordance with plans and
specifications
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare MEPF materials take-off (BOQ)
Weight Load Calculation of MEPF Materials, System Elements
& Equipment as required by Building Construction Consultant.
Preparation of Shop Drawings, Design plans and as-built
drawings using Autodesk Rivet Program
d) Company : SHANGHAI KAWATECH ENGINEERING CO., LTD.
Rm.903, Blk1, Withub White Cat Science Park,
No.641 Tian Shan Road, Shanghai 200336, China
Project Design & Consultancy , Construction Management,
M & E Constructing and Maintenance
Position : Chief M&E Designer/Mechanical Supervisor /Estimator
Address : No.641 Tian Shan Road, Shanghai 200336, China
Year : October 23, 2008 to May 21, 2015
F.D. Francisco_CV. 05.Apr.2023 3/8
PROJECTS UNDERTAKEN :
Mitsubishi Factory Project- Changzhu, China (Site/ Ofc. Work)
Tajima Kitchen Showroom- Shanghai China (Design & Build)
Tokan Factory Project- Changzhu, China (Site/ Ofc. Work)
Guiyang Multi Purpose Block Bldg.- Estimation work (BOQ
prep.)
Kerry Residence 3-Tower Building- Jiang Zhu, China (PJ Site
Officec Work)
Xian Multi Purposes Blocks Building- Estimation work (BOQ
prep.)
JNR8 Residential TwinTower PJ-Xin Tian Di, Shanghai, China
(Site)
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Delegation of works to the Foreman or Lead man in absence of
Site Engineer
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
e) Company : KAWATECH ENGINEERING & CONSULTING LTD.
(602, CFM bldg, 23 Lang ha, Thanh cong , Ba dinh,
HANOI-VIETNAM )
Project Design & Consultancy , Construction Management,
M& E Constructing and Maintenance
Position : AutoCAD Operator / Mechanical Supervisor
Address : 70 Pham Ngoc Thach, Dist. 3, Ho Chi Minh City, Vietnam
Year : June 15, 2005 to October 23, 2008
PROJECTS UNDERTAKEN :
Kingjim Factory – My Phouc III, Binh Doung Prov,Vietnam
Nippon Seiki Factory – Noibai Industrial Zone, Hanoi, Vietnam
Fujikura Factory – Hai Phong Industrial Zone, Vietnam
Renesas Design Bldg. – Thanh Long. Ho chi minh City, Vietnam
Nippon Konpo I Factory – Noibai Industrial Zone. Hanoi,
Vietnam
Mabuchi Motor Factory – Danang Industrial Zone, Danang,
Vietnam
Grand Lisboa Hotel & Casino (Podium Area) – Macau, China
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Delegation of works to the Foreman or Lead man in absence of
Site Engineer
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
F.D. Francisco_CV. 05.Apr.2023 4/8
f) Company : Toenec Philippines, Inc.
Mechanical &Electrical system Consulting Firm
Position : AutoCAD Operator / Mechanical Supervisor
Address : Aguirre St ,Legaspi Village, Makati City, Philippines
Year : January 25, 2004 to June 5 , 2005
PROJECTS UNDERTAKEN:
ADAMAY (PHIL’S.)Factory–Carmelray Industrial Park-II,
Philippines
FRANKE (HESNAN) Factory – Carmelray Industrial Park-II,
Philippines
KURIMOTO (PHIL’S.) OFFICE – Sky Plaza Offices Building ,
Philippines
SONY (PHILIPPINES) OFFICE – Enterprise Center Bldg., Phil.
SUNLIFE OF CANADA OFFICE – Enterprise Center Bldg.,
Philippines
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Delegation of works to the Foreman or Lead man in absence of
Site Engineer
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
g) Company : Taisei Oncho Co., Ltd. (China)
Project Design & Consultancy ,
M& E Constructing and Maintenance
Position : Senior Draftsman / Autocad Operator
Address : Shanghai China, PRC
Year : May 7, 2002 – Dec. 31 , 2003
PROJECTS UNDERTAKEN:
Kumatsu Factory - Sozhou, Lushi, Industrial. Industrial
Processing Zone, China
Showa Denko Factory – Dalian, Industrial. Industrial Processing
Zone, China
Terumo Medical Instrument Factory – Hangzhou,Industrial
Processing Zone, China
Taiyo Ink Factory–New Sozhou, High Tech. Industrial
Processing Zone, China
Nichicon Factory – Wuxi, Industrial Processing Zone, China
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Delegation of works to the Foreman or Lead man in absence of
Site Engineer
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
F.D. Francisco_CV. 05.Apr.2023 5/8
h) Company : Toenec Philippines, Inc
Mechanical &Electrical system Consulting Firm
Position : Senior Draftsman / Autocad Operator
Address : Aguirre St ,Legaspi Village, Makati City,
Philippines
Year : May 10, 1998 – May 5, 2002
PROJECTS UNDERTAKEN:
LUISITA INDUSTRIAL PARKS LIP-2- Hacienda Luisita, San
Miguel, Philippines
SOHBI-KOHGEI Factory– Lima Technology Center, Lipa City,
Batangas , Philippines
MD DISTRIPARK WAREHOUSE – Biñan, Laguna (Industrial
Zone), Philippines
HADSYS FACTOR – Biñan, Laguna (Industrial Zone),
Philippines
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Delegation of works to the Foreman or Lead man in absence of
Site Engineer
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
i) Company : Modair Manila Co, Ltd. Inc
M& E Constructing and Maintenance
Position : Senior Draftsman
Address : Aguirre St ,Legaspi Village, Makati City, Philippines
Year : January 25, 1998 – May 5, 1998
PROJECTS UNDERTAKEN:
TAKATA Factory – Binan, Laguna Industrial Zone, Philippines
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Delegation of works to the Foreman or Lead man in absence of
Site Engineer
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
j) Company : Taisei Oncho Co., Ltd. (Vietnam)
Mechanical &Electrical system Constructing & Maintenance
Position : Sr. Draftsman / Asst. Mech’l. Engineer
Address : Dhon Dat, Ho Chi Mnh City, Saigon, Vietnam
Year : January 9, 1996 – Sept. 27,1997
F.D. Francisco_CV. 05.Apr.2023 6/8
PROJECTS UNDERTAKEN:
SUNWAH TOWER – 115 Nguyen Hue Avenue, District 1, Ho
chi minh City, Vietnam
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Monitoring of activities to ensure on time completion of the
project as scheduled
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
k) Company : Jet Eng’g. Co., Ltd, Enterprise. (Vietnam)
Mechanical & Electrical Design & Construct
Position : Technical Adviser/ Assist. Proj. manager/ Mechanical
Design Division Head
Address : Vietnam
Year : March 17, 1995 –Dec.31, 1995
PROJECTS UNDERTAKEN:
CARAVELLE HOTEL - (Le Loi Street, District - I , Ho Chi Minh
City, Vietnam
AMARA HOTEL- Le Van Sy Street, District -, Ho Chi Minh City,
Vietnam
HARBOUR VIEW - 200 Nguyen Hue Avenue, District - I, Ho Chi
Minh City, Vietnam
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
Check and implementation of works performed in accordance
with plans and specifications
Monitoring of activities to ensure on time completion of the
project as scheduled
Maintain discipline among people in order to uphold good
reputation of the company
Prepare Plumbing, Fire Protection, and HVAC materials take-off
Preparation of shop drawings, Design plans and as-built
drawings
l) Company : Shinryo (Philippines) Co., Inc.
Mechanical & Electrical system Design, Construct &
Consultancy
Position : Sr. Draftsman / Site Supervisor
Address : #845 Arnaiz Avenue, Makati City, Philippines
Year : June 12, 1992 – March 16, 1995
PROJECTS UNDERTAKEN:
THE PENINSULA MANILA - Ayala Avenue and Makati
Avenue , Phil.
HOTEL INTER-CONTINENTAL - Ayala Ave. Ayala Center,
Makati City,Philippines
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection and HVAC
works
F.D. Francisco_CV. 05.Apr.2023 7/8
Check and implementation of works performed in accordance
with plans and specifications
Prepare Plumbing, Fire Protection, and HVAC materials take-off
& Preparation of shop drawings, Design plans and as-built
drawings
m) Company : P&Z Brobio Plumbing Contractor Inc.
Plumbing & Construction Company
Position : Sr. Draftsman / Site Supervisor / Warehouseman
Address : Scout Albano, Makati City, Philippines
Year : June 01, 1989 – June 10, 1992
PROJECTS UNDERTAKEN:
EDSA SHANGRI-LA HOTEL - Saint Francis St. Mandaluyong
, Metro Manila, Philippines
EDSA PLAZA SHOPPING CENTER - 8 Storey Commercial
Building, Edsa cor. Shaw Blvd., Mandaluyong, Philippines
METROBANK PLAZA (ANNEX) - 8 Storey Commercial
Building, Edsa cor. Shaw Blvd., Mandaluyong, Philippines
ALEXANDRA CONDOMINIUM - Meralco Avenue, Pasig
City, Philippines
CHATEAU VERDE CONDOMINIUM - Atis Street corner
Kaimito Street, E. Rodriguez, Philippines
BAYVIEW TOWNHOUSES - Seafront Roxas Blvd. Parañaque,
Philippines
DUTIES AND RESPONSIBILITIES:
Direct supervision of Plumbing, Fire Protection works and
Preparation of Shop Drawings and As-built Drawings (Manual)
BUILDING SYSTEM WORKS EXPERIENCES:
SEWAGE TREATMENT PLANT - SUNWAH TOWER PROJ,
VIETNAM
DRY CHEMICAL FIRE PROTECTION SYSTEM FOR KITCHEN
(HOTEL PENINSULA PROJECT)
HOT & COLD WATER SYSTEM - FOR HOTEL & CONDOMINIUM
PROJECT (ALEXANDRA CONDOMINIUM, INTERCONTINENTAL
HOTEL, SHANGRI-LA HOTEL, CARAVELLE HOTEL, AMARA
HOTEL,
CHILLED WATER SYSTEM - FOR CENTRALIZED AIR
CONDITIONING (HOTEL PENINSULA, HOTEL
INTERCONTINENTAL, SUNWAH TOWER PROJECT, HARBOUR
VIEW, FACTORY PROJECTS, ETC.,)
SOIL, WASTE & VENTILATION SYSTEM - (ALL PROJECTS
ASSIGNED, RESIDENTIAL/ PRIVATE, COMMERCIAL, ETC.,)
FIRE PROTECTION SPRINKLER SYSTEM - (ALL PROJECTS
ASSIGNED; FACTORIES, OFFICE BUILDINGS, HOTELS &
CONDOMINIUM, ETC.,)
CENTRALIZED AIRDUCT SYSTEM - FOR AIRCONDITIONING,
EVACUATION/ VENTILATION (MOSTLY ON MAJOR PROJECT
ASSIGNED SUCH AS HOTELS, CONDOMINIUM, FACTORIES,
ETC.,)
SPLIT TYPE AIRCONDITIONING SYSTEM - (MOSTLY ON
FACTORY & RESIDENTIAL PROJECTS)
COMPRESSED AIR SYSTEM - (MOSTLY ON FACTORY
PROJECTS SUCH AS TAKATA FACTORY, ADAMAY FACTORY,
F.D. Francisco_CV. 05.Apr.2023 8/8
SOHBI-KOHGEI FACTORY, FRANKE {HESNAN} KITCHEN
EQUIPMENT FACTORY, TAIYO-YUDEN FACTORY, ETC.,)
MEDICAL GAS SYSTEM - HOSPITAL PROJECT
MECHANICAL EQUIPMENT CONTROL SYSTEM -
SUNWAH TOWER PROJECT
8. EDUCATION :
COLLEGE
Technological Institute of the Philippines
20th Avenue, Cubao, Quezon City
Bachelor of Science in Architecture
School Year: 1990-1992
VOCATIONAL
Marikina Institute of Science & Technology
Sta. Elena, Marikina, Metro Manila
Two Year Trade Technical ( Drafting Major )
School Year: 1987-1989
I hereby certify that all information written in this resume are true and correct to the best of my
knowledge and belief.
FREDERICK D. FRANCISCO