JEARJEAN GUBAN JUACALLA
YKK Bangladesh Dhaka 1st Factory Phase 3 Dyeing Pump Renovation Project
BEPZA, Savar, Dhaka, Bangladesh
March 2021 ~ July 2021
Project Description:
• Installation of SUS pipes, Centrifugal Pumps and Power Supply.
Job Responsibilities & Description :
• Preparation of approval documents.
• Checking and preparing shop drawings using AutoCAD.
• Preparation of materials take off.
YKK Bangladesh Dhaka 1st Factory Phase 4 and Rotary UPS Project
BEPZA, Savar, Dhaka, Bangladesh
November 2017 ~ July 2019
Project Description:
• Installation of 4 units - 2000kVA Power Transformers, 2 Sets - 2000kVA Rotary UPS,
MV Switchgear, Distribution Board and Main Feeder.
• Installation of Lighting, Socket Outlet System and A/C & Vents Power Supply System.
• Installation of Auxiliary System such as Telephone System and Public Address System.
• Installation of Chilled Water System, Submersible Pump Power Supply.
Job Responsibilities & Description :
• Liaising with other contractors, engineers for the daily co-ordination meeting.
• Conduct technical inspection such as Factory Acceptance Test (FAT) and Site
Acceptance test.
• Preparation of submission/approval documents and turn-over documents for
ongoing project.
• Checking and preparing designs, shop drawings using AutoCAD.
• Implementation of safety rules and regulations among subordinates.
• Conduct maintenance work and troubleshooting at site.
• Site supervision and monitoring.
• Conduct testing and commissioning.
• Preparation of materials take off.
YKK Bangladesh Dhaka 2nd Factory Project
BEPZA, Savar, Dhaka, Bangladesh
June 2016 ~ October 2017
Project Description:
• Installation of Incoming Private Pole, 2 units - 2000kVA Power Transformers, MV
Switchgear, Distribution Board, Control Panels and Main Feeder.
• Installation of Lighting, Socket Outlet System, A/C & Vents Power Supply System and
Lightning Arrester.
• Installation of Auxiliary System such as Fire Alarm System, Telephone System and
Public Address System.
• Installation of Diesel Engine Fire Pump, Booster and Submersible Pump Power Supply.
PROJECT ATTENDED & JOB RESPONSIBILITIES
Job Responsibilities & Description :
• Liaising with other contractors, engineers for the daily co-ordination meeting.
• Conduct technical inspection such as Factory Acceptance Test (FAT) and Site
Acceptance test.
• Preparation of submission/approval documents and turn-over documents for
ongoing project.
• Checking and preparing designs, shop drawings and as-built drawing using
AutoCAD.
• Implementation of safety rules and regulations among subordinates.
• Conduct maintenance work and troubleshooting at site.
• Site supervision and monitoring.
• Conduct testing and commissioning.
• Preparation of materials take off.
Improvement of the Capacity of Public Food Storage in the People's Republic of Bangladesh
(Solar Generation) Project
Silo Santahar, Bogra District, Bangladesh
Dec. 2015 ~ May 2016
Project Description:
• Installation of On-grid 360kWp Photovoltaic Solar Panel and Structure frames.
• Installation of Combiner Box, Inverter and PV Distribution Board.
• Installation of Main Feeder & Lightning Protection System.
Job Responsibilities & Description:
• Liaising with other contractors, engineers for the daily co-ordination meeting.
• Conduct technical inspection such as Factory Acceptance Test (FAT) and Site
Acceptance test.
• Preparation of submission/approval documents and turn-over documents for
ongoing project.
• Preparation off shop drawings and as-built drawing.
• Implementation of safety rules and regulations among subordinates.
• Site supervision and monitoring.
• Conduct testing and commissioning.
• Preparation of materials take off and material controller.
As an Electrical Engineer, I can able to provide a system design analyses and some calculation
which involves in every project such as:
1. Voltage drop calculation
2. Short circuit calculation
3. Arc flash analysis
4. Protective relay coordination
5. Illumination calculation
6. Fire alarm protection calculation
7. Prepare electrical drawings using AutoCAD
EXPERTISE: