BUILDING PERMIT
Memo No: BP-2024021511011ba4ae30 Date: 09-May-2024
To: NICCA BANGLADESH CO., LTD.
Upon consideration of your application and drawings and documents submitted therewith, BEZA grants the Building
Permit for construction of building as described below:
Name of the Economic Zone : Bangladesh Special Economic Zone Limited
Plot Number : LOT NO. C6
Land Area(sqm) : 13602 sqm
No. of Building : 03
Building Area(sqm) : 4531.000000000001 sqm
Total Floor Area(sqm) : 4507.700000000001 sqm
Terms and Conditions for Approval:
1. The construction shall be implemented as per the approved Plan and Drawings. No alteration or modification in the
plan, design or construction work shall be made without obtaining prior approval from the BEZA.
2. This Building Permit (the Permit) shall remain valid for 1 (one) year from the date of its issuance and shall become
invalid if the construction works is not commenced within this period or construction work is abandoned or suspended
after commencement.
3. The construction works shall be implemented in strictly compliance with the Bangladesh National Building Code,
2020, Bangladesh Economic Zone (Construction of Building Rules), 2017, Fire Fighting Floor Plan approved by the
FSCD, terms and conditions of ECC for orange A and B Category and EIA approval of DoE for Red Category Project.
4. You shall submit the application form with other required documents for the Inspections to BEZA-OSS Center.
5. This Permit is issued based on the, information and documents furnished by you with your Building Permit
Application.
6. You shall submit the application requesting Inspections by BEZA-OSS Center the phase-wise progress of construction
work as below:
(i) First Inspection : at the stage of foundation work;
(ii) Second Inspection : at the stage of structure framing work; and
(iii) Final Inspection : at the end of completion of construction work.
7. After completion of construction and before using the building, you shall obtain completion certificate from BEZA.
8. In the event of any violation of any terms and conditions set for above, or any order or direction issued by BEZA
during construction or after inspection, this Permit may be suspended or cancelled.
9. BEZA reserves the rights to issue any addendum to this permit and such addendum, if issued, shall form the part of this
Permit. THIS IS A COMPUTER GENERATED PERMIT. SO SIGNATURE IS NOT REQUIRED.
1 of 1