Application for Approval of Fire Fighting Floor Plan (NOC) (Required information for BEZA OSS)
1. General Information [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name of the owner of Building
2 | Mobile Number of Building owner
3 | Email ID of Building owner
4 | Owner’s Address:
5 | Location and size of proposed land or plot
6 | Nearest Fire Station
7 | Name of Economic Zones
8 | Municipality/Union Parishad
9 | Block/ Section/ Zone No
10 | Plot No
11 | Holding No
12 | Area of Land
13 | Type of Land
14 | District and police station / Upazila of the proposed building
15 | Details of existing structures on land or plots
16 | Name of main road adjacent to plot
17 | Width of main road to plot (meter)
18 | Length of plot connecting road
19 | Width of plot connecting road
20 | Length of Proposed internal road
21 | Width of Proposed internal road (including turning circle)
22 | Description of the surroundings of plot/land: | At North+South+East+West
23 | Detailed description of proposed building Building Classification for use
24 | Height of building
25 | Number of Floors
26 | Number of Basement Floor
27 | Area of each Mezzanine Floors (Sq. Meter)
28 | Area of each Basement Floors
29 | Area of each Semi Basement Floors
30 | Total area of all floors
31 | For Residential Building, total residences/apartments and flats:
32 | For mixed category use the description of floors that will be used for each category
33 | Is there any high voltage electric line above the plot and both vertical and horizontal distance from the proposed plot?
34 | Name and address and registration number of the architect and engineer concerned with the construction work | Name of the Architect & Engineer & Address and Registration No
3. Required document (attachment)
Sl. No. | Name of documents | Remarks
1
2
4
5 | Floor plan and Roof plan separately
6 | Outlook of building from outside.
7 | JPG format
8
9
10 | Machinery layout and installation plan with production flow chart
11
12 | For imported construction material BOQ is required.
13
Note: Need to apply through BEZA OSSC. For land use permit 30 working days needed. All map must be signed, seal and attested by IEB and IEA approved Engineer and Architect. Maps must be printed on Ammonia sheet blue Paper. The drawing scale must be 1:100. Total 3 sets of all documents must be submitted to BEZA.