D.2 Services and Clearance relating to Fire Extinction:
The new industrial revolution has been begun throughout the country by implementing the Bangladesh
Economic Zones Act-2010. As a consequence of industrialization there will be potential fire risks arisen from
the process of different flammable and chemical materials, as well as the huge consumption electric power and
pressurized gases. Economic Zone Unit Investor has to take necessary approval from BEZA OSS Centre to
protect human safety as well as their investment protection and which will be issued by Fire Service and Civil
Defence (FSCD).
The first step is the Approval of Fire Fighting Floor Plan (NOC). It indicates that the building fire safety is
designed as per the norms and regulations. The Unit Investor should apply for Approval of Fire Fighting Floor
Plan (NOC) before starting the building construction.
The second step is Effectiveness Certificate in favor of Fire safety arrangement. After completion of fire safety
arrangement works as per approved plan, the unit investor should apply BEZA OSS Centre for Effectiveness
Certificate in favor of Fire Safety arrangement as per condition of NOC.
The third step is the Fire License. Fire License is an obligatory permit for all factory and warehouse. After getting
Effectiveness Certificate in favor of Fire safety arrangement, the investor should apply to BEZA OSS Centre for
Fire Licenses and it should be renewed every fiscal year.
The application for Fire Safety related clearance needs to be applied online through the FSCD website until
the online integration between FSCD and BEZA OSSC but all required documents have to be submitted at BEZA
OSS Centre. After the online integration, the applicant may apply through their user account at the BEZA OSS
website.
D 2-1. Approval of Fire Fighting Floor Plan (NOC):
After receiving Land use plan permit by BEZA through BEZA-OSS Center, an EZ Unit Investor may apply for
Approval of Fire Fighting Floor Plan (NOC) . Key elements related to the Approval of Fire Fighting Floor
Plan in Economic Zone are as shown in the following table.
Required Documents [One (1) Original (FSCD) and three (3) Copies (BEZA, EZ Developer, EZ
Unit Investor) and all documents copies in PDF version by CD should be
submitted to BEZA OSS Centre]
1) Application Form (electronic) through online; (FORM-FL-01)
2) Copy of Letter of Allotment (LOA) issued by BEZA/Zone Developers.
3) Copy of Investment Clearance from BEZA
4) Copy of Approved Land use Plan.
5) Floor Layout Plan with Elevation and Section
6) Google Map (To be highlights proposed plot in Google Map by mentioning
the company name)
7) Fire Fighting Floor Plan; Four (04) sets in book format (The Plan must be
prepared by enlisted engineering firms in FSCD and the details procedure
has been mentioned in the Annexure-1).
8) Description of what kind of combustible material will be
stored/used/processed/sold at the proposed factory. (According to
prescribed Form; Form-FL-02).
9) Copy of Membership certificate of architect/ Engineers who is prepared
Fire Fighting Floor Plan.
10) The undertaking in Treasury Stamp of BDT 300/- stating that the building
shall be constructed by following Bangladesh National Building Codes
(BNBC) and Fire Prevention & Extinction Act, 2003.
11) Other document and drawing required by BEZA OSS Centre.
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-2
Legal Basis 1) Fire Prevention and Extinction Act, 2003
2) Fire Prevention and Extinction Rules, 2014
3) BNBC 2006.
Actual Procedures 1) The Applicant will visit BEZA-OSS website and fill out online application
form and submit above mentioned required documents.
2) BEZA-OSS Centre will check the application with required documents and
forward to Bangladesh Fire Service & Civil Defence (FSCD).
3) After receiving the document, Fire Service & Civil Defence (FSCD) will
assign an inspection team who will fix the date of inspection and inform to
applicant as well as BEZA OSS Centre.
4) The inspection team will conduct the inspection on the schedule date in
presence of applicant or his assignee & prepare Inspection report and
forward to the Approval Committee of FSCD.
5) After getting inspection report, approval committees will check the
required documents and design as per regulation.
6) If everything is found satisfactory, the Fire Service & Civil Defense will
issue “ Approval of Fire Fighting Floor Plan (NOC) ” and forward it to
BEZA OSS Centre.
7) If any remedial & correction is required, FSCD will issue a letter to the
Applicant for “Notification of mistakes of application for clearance and
corrections thereof”
8) After corrective measures done, the Approval Committee will review all
the documents again and issue “ Approval of Fire Fighting Floor Plan
(NOC) ” & forward to BEZA OSS Center.
9) BEZA OSS Center will hand over the “ Approval of Fire Fighting Floor
Plan (NOC) ” to the applicant after receiving it from FSCD.
Required Processing Time 30 working days if no objection.
Application Fee Free of Charge
Remarks - Fire Fighting Floor Plan must be prepared from enlisted engineering Firms
by FSCD. The updated list of enlisted engineering firms available at FSCD
website www.fireservice.gov.bd (Circular Section)
- If the EZ developer has own “Internal Regulations for fire safety”, the
applicant shall obtain an evidence of confirmation of the Fire Safety Plan
from the EZ developer and attach to the application documents.
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-3
D-2.2 Effectiveness Certificate in favor of Fire Safety Arrangement:
Key elements related to the Effectiveness Certificate in Economic Zone are shown in the following table
Required Documents [One (1) Original (FSCD) and three (3) Copies (BEZA, EZ Developer, EZ
Unit Investor) and all documents copies in PDF version by CD should be
submitted to BEZA OSS Centre]
1) Application through forwarding letter in company letter head. (FORM-
FL-05)
2) Copy of Approved Fire Fighting Floor Plan (NOC)
3) Inspection and Testing report on each and every installed fire safety
equipment’s; From Factory/ Contractor’s Engineer with seal and sign.
4) Certificate from related architect and engineer stating that the building has
been constructed according to plan approved by the Fire Service and Civil
Defence and its fire-fighting arrangement, warning arrangement,
emergency exit stairs, fire lift, fire command station and other
arrangements have been completed as per fire-fighting floor plan.
5) Other document and drawing required by BEZA OSS Centre.
Legal Basis BNBC 2006
Actual Procedure 1) Applicant is required to apply to BEZA OSS Centre with a letter head
Pad.
2) BEZA-OSS Centre will check the application with submitted documents
and forward to Bangladesh Fire Service and Civil Defence.
3) After receiving the documents, Fire Service & Civil Defence will assign
an inspection team who will fix the date of inspection and inform to
applicant as well as BEZA OSS Centre.
4) The inspection team will conduct the inspection on the scheduled date in
order to check the fire safety arrangement done in line with approved Fire
Fighting Floor Plan.
5) Then the inspector will prepare the inspection report in favor of Fire
Safety arrangement and forward it to the FSCD Head Quarter.
6) If everything found satisfactory, FSCD will issue “ Effectiveness
Certificate in favor of Fire Safety Arrangement” and will forward it to
BEZA OSS Centre.
7) If any remedial or corrective measures is required, FSCD will issue a letter
to applicant with a list of incomplete work in favor of fire safety
arrangement.
8) After remedial or corrective measures done, the inspector will further
inspect and prepare the inspection report and send it to the FSCD Head
Quarter for issuing of “ Effectiveness Certificate in favor of Fire Safety
Arrangement” .
9) BEZA OSS Center will hand over the “Effectiveness Certificate in favor
of Fire Safety Arrangement” to the applicant after receiving it from
FSCD.
Required Processing Time 15 working days if no objection is raised during inspection.
Application Fees Free of Charge
Remarks - If the EZ developer has own “Internal Regulations for fire safety”, the
applicant shall obtain an evidence of confirmation of the Fire Safety
Plan from the EZ developer and attach to the application documents.
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-4
D 2-3. Fire License:
Key elements related to the Approval of Fire License in Economic Zone are as shown in the following table
Required Documents [One (1) Original (FSCD) and three (3) Copies (BEZA, EZ Developer, EZ
Unit Investor) and all documents copies in PDF version by CD should be
submitted to BEZA OSS Centre]
1) Application Form (electronic) through online; (FORM-FL-07)
2) Copy of Land Lease Agreement
3) Copy of Trade License issued by BEZA.
4) Copy of Certification of Incorporation with Memorandum and Articles of
Association from RJSC
5) Copy of approved Fire Fighting Floor Plan by FSCD.
6) Effectiveness Certificate in favor of fire safety arrangement; From Fire
Service and Civil Defence (FSCD).
7) Other documents and drawings required by BEZA-OSS Centre.
Legal Basis 1) Fire Prevention and Extinction Act, 2003
2) Fire Prevention and Extinction Rules, 2014
Actual Procedures 1) The Applicant will visit BEZA-OSS website and fill out online application
form and submit above mentioned required documents.
2) BEZA-OSS Centre will check the application with required documents
and forward to Bangladesh Fire Service and Civil Defence.
3) After receiving the documents, Fire Service and Civil Defence will
forward it to respective licensing authority for issuing Fire License.
4) Afterwards, respective licensing authority will assign an inspector who
will fix the date of inspection and inform to applicant as wells as BEZA
OSS Centre.
5) The Inspector will conduct the inspection on scheduled date in presence
of applicant or his assignee and forward the inspection report with
assessment to licensing authority.
6) If everything is found satisfactory, the licensing authority will issue the
demand note and the applicant is required to pay the amount according to
prescribed demand note to the bank and submit the invoice/ treasury
challan to respective licensing authority.
7) If any remedial & correction is required, FSCD will issue a notification
letter to the applicant.
8) After remedial or corrective measure done, the inspector will further
inspect the site and forward the inspection report with assessment to
licensing authority.
9) Afterwards, the licensing authority will issue the demand note and the
applicant is required to pay the amount according to prescribed demand
note to the bank and submit the invoice/ treasury challan to respective
licensing authority.
10) After getting treasury challan respective licensing authority will issue the
“Fire License” and forward it to BEZA OSS Centre through FSCD Head
Quarter.
11) BEZA OSS Centre will hand over it to the applicant after receiving the
“Fire License ” from FSCD.
Required Processing Time Within 15 days after submitting full set of application for Fire License.
License Fee Maximum BDT 8000/- depends on nature/volume of combustible material.
Remarks
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-5
D 2-4. Renewal of Fire License:
Key elements related to the Approval of Fire License in Economic Zone are as shown in the following table
Required Documents 1) Application Form (electronic) through online; (FORM-FL-09)
2) Original copy of Fire License.
3) Treasury challan of license renewal Fee.
4) Other documents and drawings required by BEZA-OSS.
Legal Basis 1) Fire Prevention and Extinction Act, 2003
2) Fire Prevention and Extinction Rules, 2014
Actual Procedures 1) The Applicant will visit BEZA-OSS website and fill out online application
form and submit above mentioned required documents.
2) BEZA-OSS Centre will check the application and forward to Bangladesh
Fire Service and Civil Defence.
3) After receiving the documents, Fire Service and Civil Defence will
forward it to respective licensing authority for issuing Renewal of Fire
License.
4) The respective licensing authority will assign an inspector who will fix the
date of inspection and inform to applicant as wells as BEZA OSS Centre.
5) The Inspector will conduct the inspection on scheduled date in presence of
applicant or his assignee.
6) If everything is found satisfactory, assign inspector will renew the Fire
License and inform to licensing authority as well as BEZA OSS center
through the FSCD Head quarter.
7) If any remedial & correction is required, Inspector will issue a notification
letter to the applicant.
8) After remedial or corrective measure done, the inspector will further
inspect the site and renew the Fire License.
Required Processing Time Within 15 days after submitting full set of application for Renewal of Fire
License.
License Fee Same amount of Fire license Fees.
Remarks
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-6
LIST OF FORMS:
FORM-FL-01 Application for Approval of Fire Fighting Floor Plan (NOC).
FORM-FL-02 Description of what kind of combustible material will be stored /used/processed/sold at
the proposed factory.
FORM-FL-03 Notification of mistakes of application for clearance and Corrections thereof.
FORM-FL-04 Approval of Fire Fighting Floor plan (NOC).
FORM-FL-05 Application for Effectiveness Certificate in Favor of Fire Safety Arrangement.
FORM-FL-06 Approval of Effectiveness Certificate in Favor of Fire Safety Arrangement.
FORM-FL-07 Application of Fire License.
FORM-FL-08 Fire License Form.
FORM-FL-09 Application of Renewal of Fire License
Annexure-01 The Item to be included in the Fire Fighting Floor Plan.
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-7
FORM-FL-01
Application for Approval of Fire Fighting Floor Plan (NOC)
Name of the owner of Building :
Mobile Number of Building owner :
Email ID of Building owner :
Owner’s Address:
:
Division District Thana/Upazila
Drop Down Menu Drop Down Menu Drop Down Menu
Owner’s Address
Location and size of proposed land or
plot :
Nearest Fire Station : Division District Thana/ Upazila
Drop Down Menu Drop Down Menu Drop Down Me nu
Name of Economic Zones :
Municipality/Union Parishad :
Block/ Section/ Zone No :
Plot No :
Holding No :
Area of Land :
Type of Land : Dropdown Menu
District and police station / Upazila of the
proposed building : Division District Thana/Upazila
Drop Down Menu Drop Down Menu Drop Down Menu
Details of existing structures on land or
plots :
Name of main road adjacent to plot :
Width of main road to plot (meter) :
Length of plot connecting road :
Width of plot connecting road :
Length of Proposed internal road :
Width of Proposed internal road (including
turning circle) :
Description of the surroundings of plot/land:
:
Detailed description of proposed building :
Building Classification for use :
Height of building :
Number of Floors :
Number of Basement Floor :
( Not Applicable)
At North At South
At East At West
Drop Down Menu Drop Down Menu
( Not Applicable)
( Not Applicable)
( Not Applicable)
( Not Applicable)
( Not Applicable)
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-8
Number of Mezzanine Floors :
Number of Basement Floors :
Area of each Mezzanine Floors (Sq. Meter) :
Area of each Basement Floors :
Area of each Semi Basement Floors :
Total area of all floors :
For Residential Building, total
residences/apartments and flats: :
For mixed category use the description of
floors that will be used for each category :
Is there any high voltage electric line above
the plot and both vertical and horizontal
distance from the proposed plot? : Yes No
Name and address and registration number
of the architect and engineer concerned with
the construction work :
Attachment:
a. Copy of Letter of Allotment (LOA) issued by BEZA/Zone Developers.
b. Copy of Investment Clearance from BEZA
c. Copy of Approved Land use Plan from BEZA.
d. Floor Layout Plan with Elevation and Section.
e. Google Map (To be highlights proposed plot in Google Map by mentioning the company name)
f. Fire Fighting Floor Plan (The Plan must be prepared by enlisted engineering firms in FSCD and the
details procedure has been mentioned in the Annex-1).
g. Description of what kind of combustible material will be stored/used/processed/sold at the proposed
factory. (According to prescribed Form; Form-FL-02).
h. Copy of Membership certificate of architect/ Engineers who is prepared Fire Fighting Floor Plan.
i. The undertaking in Treasury Stamp of BDT 300/- stating that the building shall be constructed by
following Bangladesh National Building Codes (BNBC) and Fire Prevention & Extinction Act,2003.
j. Other document and drawing required by BEZA OSS Centre.
I/we hereby certify that the above information have been given in accordance with the Fire Prevention and
Fighting Rules, 2014 and to the best of my/our knowledge the information are correct. If any false information
or irregularity is found after approval of the license or if any government requirement arises, the Director general
can cancel the clearance permission if he so desires. Aside from this I/we shall be bound to provide any
information or document under this Rules .
Name of the Engineer & Address
( Not Applicable)
( Not Applicable)
( Not Applicable)
( Not Applicable)
Name of the Architect & Address
Registration No
Registration No
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-9
FORM-FL-02
Description of what kind of Combustible Material will be stored /used/processed/sold at the proposed factory
*The Material Safety data sheet should be attached along with the Form-02
Sl. No
Name of the combustible raw material, which
is related to be stored, its pattern of use
/processing/purchase/sale, etc.
(combustible material list describes 1 st
schedule of under the Fire Prevention and
Extinction Rules-2014)
Volume of the
inflammable raw
material
(Unit)
Possible location name of combustible material
(Location name should be same as per Fire
Fighting Floor Plan mentioned location name)
*Material Safety Data Sheet
(MSDS) for combustible
material
(1) (02) (03) (04) (05)
Attached along with the Form
Attached along with the Form
Attached along with the Form
Attached along with the Form
Attached along with the Form
Attached along with the Form
Attached along with the Form
Attached along with the Form
Attached along with the Form
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-10
FORM-FL-03
Memorandum No: - FS and CD/Fire/ …………………………… Dated: ……………………
To: ………………………………………………….
…………………………………………………
………………………………………………….
Subject: Notification of mistakes of application for clearance and Corrections thereof.
Reference: ……………………………………………………………………………………………
In the light of above subject and reference it is to inform you that, after detailed examination of
information/ firefighting floor plan attached in your application, following mistakes have been detected for
which we are unable to accord approval of clearance.
You are requested to correct the following mistakes/omissions and re-submit the same in the form mentioned
in Standard Operating Procedure (SOP) by next ……. days. In case of failure to re-submit the application
within the time frame, the application for clearance will be considered as not approved .
Schedule of Proposed Land or Plot:
Mistakes : -
1. ………………………………………………………………………………………………….
2. …………………………………………………………………………………………………..
3. ……………………………………………………………………………………………………
4. ……………………………………………………………………………………………………
Director (Operation and Maintenance)
Memo No/FSOCD/Fire/……………………… Dated: ………………………
Copies to:
1 ……………………………………………………………….
2 ……………………………………………………………….
3 ……………………………………………………………….
4 ……………………………………………………………….
(a) Name of the Economic Zones: ………………………………………………………………………….
(b) Zone /Sector No: …………………………... (c) Road Name & No: ………………………...
(d) Plot No: ……………………………………. (e) Fire Station: ……………………………….
(f) Police Station: ……………………………… (g) Upazila: …………………………………...
(h) District: …………………………………...... (i) Total Land: ………………………………...
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-11
FORM-FL-04
The Government of the Peoples’ Republic of Bangladesh
Department of Fire Service and Civil Defence
Quazi Alauddin Road, Dhaka.
www.fireservice.gov.bd
In the light of above-mentioned subject, it is to inform that the Fire Fighting Floor Plan submitted
along with the application for construction of ……. storey industrial buildings in the Plots …………… of
……………Economic Zone, ……………………were examined by the committee. As the fire fighting floor
plan been prepared in accordance with the checklist and suggestions provided by this Department and as the
committee found it correct in all respect, the fire fighting floor plan is hereby approved. The No Objection
Certificate for construction is hereby accorded subject to strict adherence to following terms and conditions.
This No Objection Certificate is applicable only for the fire fighting arrangement of the building.
Terms and Conditions :
1. The start of construction of the proposed building must be intimated to this department without delay
and Fire Service and Civil Defence authority will have the right to inspect the under-construction building
at any time they want.
2. This department must be intimated in writing soon after completion of construction works of the building,
and also, an application to be submitted to this department for Effectiveness Certificate in favour of the
fire-fighting arrangement of the building. While applying for certificate of effectiveness for fire-fighting
arrangement, certificate from architect and engineer will have to be obtained that the building has been
constructed according to plan approved by the Department office and its fire-fighting arrangement,
warning arrangement, emergency exit stairs, fire lift, fire command station and other arrangements have
been done as per fire-fighting floor plan. The certificate should also mention that all arrangements are in
order and in operable condition. (BNBC, Part-4)
3. Soon after obtaining Effectiveness Certificate for fire prevention arrangement, a Fire-fighting and Rescue
Management Committee will have to be formed within the inhabitants of the building. Under supervision
of the committee at least 20% inhabitants of the building will have to take part in fundamental training
on “Fire-fighting and Rescue” and “First Aid” or primary medication (BNBC-Part 4).
4. For initial two years, fire-fighting exercise will have to be conducted with participation of building
inhabitants on quarterly basis. Thereafter, the exercise may be arranged on half-yearly basis. (BNBC,
Part-4).
5. All electrical appliances, fittings and wirings of the building must be examined for suitability by Chief
Power Inspector according to Electric Act 1937, modified 1947.
Memo No. Dated
To: Managing Director
Plot No………………………………………….
…………………………………Economic Zone,
Address of the Industry.
Subject: Approval of Fire Fighting Floor Plan and No Objection Certificate for construction of
Industrial Building.
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-12
6. Clearance certificate permitting living or using the building will be given only after the Authority is
satisfied that the fire-fighting arrangements and other arrangements of the building has been done in
accordance with the approved floor plan.
7. Living in or using the building after construction without obtaining clearance certificate from this
department, or in case of violation of any mentioned terms and conditions, legal actions against the
building owner or construction authority can be taken as per Section 20 of Fire Prevention and
Extinguishing Act 2003. Aside from this, under section 8(4) of the same act, the building may be declared
unsuitable for living or using for not meeting fire-fighting requirements.
8. All interior materials used in the building/organization shall have to be fire proof.
9. To prevent fire spreading, GPG Morter has to be used in all duct lines and electrical cable holes and
Electrical Line Fire Retardant Conduit must be ensured.
10. Fire exits must be fire, smoke and heat free/resistant.
11. The approved Fire Fighting Floor Plan will be treated as cancelled in case of violation of any of the above-
mentioned terms and conditions or violation of the approved floor plan or any other intentional
mistakes/omissions or wrong information in the documents and information provided by the applicant.
Attachment: Approved design 01 (one) Copy.
Director (Operation & Maintenance)
Telephone:
Dated:
Memo No
Copies sent for kind information:
1.
2.
3.
4.
5.
6.
7.
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-13
FORM-FL-05
(TO BE APPLIED/TYPED IN THE COMPANY'S LETTER HEAD PAD)
To: Director General,
Fire Service and Civil Defence Department
Quazi Alauddin Road, Dhaka.
Subject: Application for Effectiveness Certificate in favor of Fire Safety Arrangement.
1. Name of the Applicant……………………………………. Address……………………………
………………………………………Telephone/Mobile………………………………………...
Fax No. …………………………………………………Email No……………………………….
2. Name of the owner of Newly Constructed Building
……………………………………………………………………………….
Address……………………………………………………………………………………………...
3. Schedule of Newly Constructed Land or Plot:
4. Detailed description of Newly Constructed plot and building:
No Objection Certificate (NOC) Number for newly constructed Factory building
:……………………………………………………………………………………………………..
Building Classification for use: ……………. Height of building………………. Meter, Number of
Floors…………, Number of Basement Floor………Number of Mezzanine Floors: ………………, Size of
each floor……………………………………Sq. Meter, Size of each Mezzanine floor………..…..Sq Meter,
Size of Basement Floor………………….sq. Meter, Total area of all floors…………………. Sq Meter.
5. Name, Address and Enlistment Number of Engineer and Architect of construction company:
Architect: …………………………………………………………………………………………
IAB Number…………………………………
Structural Engineer …………………………………………………………………………………
IEB Number…………………………………
(a) Name of the Economic Zones: …………………………………………………………………..
(b) Zone /Sector No: …………………………... (c) Road Name & No: ……………………
(d) Plot No: ……………………………………. (e) Fire Station: ……………………………
(f) Police Station: ……………………………… (g) Upazila: ………………………………
(h) District: …………………………………...... (i) Total Land: ……………………………
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-14
6. Description of design and related document Submitted with the application:
a. Copy of Approved Fire Fighting Floor Plan (NOC)
b. Inspection and Testing report on each and every installed fire safety equipment (by mentioning
technical specification and location); From Factory/ Contractor’s Engineer with seal and sign.
c. Certificate from related architect and engineer stating that the building has been constructed
according to plan approved by the Fire Service and Civil Defence and its fire-fighting arrangement,
warning arrangement, emergency exit stairs, fire lift, fire command station and other arrangements
have been done as per fire-fighting floor plan.
d. Other document and drawing required by BEZA OSS Center.
I/We hereby certify that, the newly constructed building is constructed according to approved Fire Fighting
Floor. Now we are waiting for your inspection. If any false information or irregularity is found after
Effectiveness Certificate in favor of the Fire Safety arrangement or if any government requirement arises, the
Director general can cancel the certificate if he so desires. Aside from this I/we shall be bound to provide any
information or document under this Rules .
Dated: ……………………… Applicant’s Signature …………………….
Name ( )
Designation
Contact No:
E-mail ID:
Address…………………………………………..
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-15
FORM-FL-06
Memorandum No: - FS and CD/Fire/ ……………………………………
Dated: ………………………
To: ……………………………………………
…………………………………………………
…………………………………………………
Subject: About issuance of Effectiveness Certificate in favour of fire safety arrangement
Reference: ………………………………………………………………………………………….
In the light of the above reference your application dated ………………..was examined with due
consideration and as the building mentioned in the schedule below was constructed in accordance with
approved firefighting floor plan and all other conditions applicable for Clearance Certificate, and as other
arrangements were examined to be satisfactory, you are hereby accorded the Effectiveness Certificate in
favour of fire safety arrangements with following conditions:
Schedule of Newly Constructed Land or Plot:
Conditions:
1. After one month of receipt of Certificate a fire fighting and management committee comprising of the
occupants of the Factory building will have to be formed. Training on Firefighting, rescue, first and
emergency extrication to at least of 20% of able-bodied occupants of the building have to be imparted
from FSCD, and this will have been ensured by the authority
2. In the first two years of living in and using the building, a fire fighting exercise every three months will
have to be arranged in collaboration with Fire Service and Civil Defence Department. The exercise should
include emergency exit, rescue, and fire extinction. Participation of all employee of the factory building
has to be ensured.
3. The list and location of all firefighting equipment’s and accessories placed in the building must be
preserved by fire command station.
4. Every three months the serviceability of firefighting arrangement including fire extinguisher, smoke and
heat detector and other detectors, alarm bell, manual call point, strobe, riser, sprinkler, hose reel, hydrant,
panel board, PA system, blower machine that creates positive pressure , fire and smoke vent, fire lift, auto
enclose, emergency light, exit sign, and all other related accessories must be checked very sincerely. In
case any equipment is found defective, their repair/replacement has to be arranged during inspection. And
the inspection report must be written in a register.
(a) Name of the Economic Zones: …………………………………………………………………..
(b) Zone /Sector No: …………………………... (c) Road Name & No: ……………………
(d) Plot No: ……………………………………. (e) Fire Station: ……………………………
(f) Police Station: ……………………………… (g) Upazila: ………………………………
(h) District: …………………………………...... (i) Total Land: ……………………………
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-16
5. Inspection by at least one diploma engineer of each and every electric installation, wirings, and fittings
once in every year have to be ensured, the inspection results must be recorded in a register.
6. At least one FSCD trained leader/sub-officer/station officer or equivalent retired officer must be
employed to ensure appropriate use, effectiveness, and maintenance of the firefighting equipment of the
building or installation.
Director (Operation & Maintenance)
Memo No./FSOCD/Fire…………………………. Telephone
Dated: ………………………….
Copies to:
1. ………………………………………………………
2. ……………………………………………………..
3. ……………………………………………………..
4. …………………………………………………….
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-17
+New Add
FORM-FL-07
Organization Information
As per section 4 of Fire Prevention and Extinction Act-2004
All fields marked with an asterisk (*) must be filled in.
Name of the Organization* Business Types of the Organization*
Name of Managing Director *
Nantional Identification No Passport (for Foreign
Citizen)
Mobile Number*
Owner’s Address
Division District Thana/Upazila
Address
The duration of the license application *
Location of the Organization/Address:
Division* District* Thana/Upazila*
Nearest Fire Station* Post Office* Indiacate the location of your factory on Google Maps
Ecnomic Zone Name Zone No
Road Name & No Plot No
Latitude Langitude
Description of what kind of combustible material will be stored/used/ processed / sorted /
purchased/ sold at the factory/warehouse:
Building Information
Buiding
Types*
Area of
the
Building
(Sq.Feet)*
Number
of
Floor/
Storied
Useable
Floors
Is there
any
Founda
tion?
Access
to
Roof
Is there
any
Mezzanine
Floor?*
Own
Building/Rented
Building?*
Drop Down Menu
1
Drop Down Menu
2
Drop Down Menu Drop Down Menu Drop Down Menu
Enter a address for search in Map
D
3
4
5
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-18
Annual Price of Warehouse/ Factory (BDT)
Details of fire Prevention and security management of warehouse/factory (The building design and
Fire Fighting plan must be displayed to inspector officer and one copy should be given to inspector
officer)
If the applicant is a firm, the type of firm, name, status address of its board of
director/partner/managing committee
The width of the access road of Factory/Warehouse (Writedown details how many feet)
Description of Boundary of Building
Wheather there is No objection Certificate (Fire Fighting Related) for construction of multistoried
/commercial building from Fire Service and Civil Defence? *
Yes NO On Process
Applicant Information
Applicant Information
This information will help to identify the key/related person associated with this application
Name of the Applicant /Owner *
Email of the Applicant/Owner Mobile Number of the Applicant/Owner
Information about creating account
An Account will be created for applicant with the following information; Using this account applicant can
apply one/more applications and monitor their progress. Enter an email for applicant account and create
a pass
Any Mail Write down any password Confirm the password
6
7
8
9
10
0
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-19
FORM-FL-08
Fire License
License No:
As per the Section 4 of Fire Prevention and Extinguish Act of 2003, and according to the terms and conditions
mentioned, Fire License is hereby issued.
1. Name, status and address of owner/user/authority of the warehouse/factory:
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
Phone: ……………………… Fax…………………………. e-mail: ………...………………………...
2. Location of warehouse/factory
(a) Name of the Economic Zones: …………………………………………………………………………...
(b) Zone/ Sector No: …………………. (c) Road Name & No …………………………………………..
(d) Plot No: …………………............... (e) Fire Station …………………... (f) Post Office…………
(g) Police Station……………………... (g) Upazila ………………………... (h) District: …………....
3. Classification of the building utility:
4.Construction Category of the building and its size:
Cat-2 Cat-2 Cat-3 Length Width Height Floor Area (in square Meter)
ONIBEPRO 003
First Edition 2012
Serial No:
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-20
5.Name and stock details of inflammable material:
6. Type of Business:
7.Scale of Fire Risk: (a) Light -1 (b) Light -2 (c) Normal -1 (d) Normal-2 (e) Normal-3 (f) Extreme
8.Classificaton of Fire Risk (Based on total floor area
ratio):
Deputy Director /Assistant Director / Assistant -Deputy Director
Fire Service & Civil Defense, …………………………………...
Terms and Conditions of License
(1) The fees for license renewal have to be deposited as advance license fee before 30 June of each year.
(2) The license given is not transferable and it will be applicable only for serial 2,
(3) The authorized officer of the Department can, at any week day inspect the warehouse or factory to
see whether license terms and conditions are being observed properly. During inspection the
concerned authority is bound to show license as asked for.
(4) It is to be ensured that the overall fire prevention arrangement is done in keeping with the appropriate
rules of Bangladesh National Building Code and Fire Prevention and Extinguish Act 2003.
(5) According to the Fire Prevention and Extinguish Act 2003 violation of any of the terms and conditions
given in the license will be considered as punishable offence.
A……...% B……..% C…….. %
D……...% K……..% ,
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-21
Date Invoice No. Duty (Year of Finance)
1 Jul-30 June
Seal with
Name
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-22
Date Invoice No. Duty (Year of Finance)
1 Jul-30 June
Seal with
Name
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-23
+New Add
FORM-FL-09
Organization Information
As per section 4 of Fire Prevention and Extinction Act-2004
All fields marked with an asterisk (*) must be filled in.
Name of the Organization* Business Types of the Organization*
Name of Managing Director *
Nantional Identification No Passport (for Foreign
Citizen)
Mobile Number*
Owner’s Address
Division District Thana/Upazila
Address
License Number * The Year License is Issued *
Periord of the renewal of License*
Location of the Organization/Address:
Division* District* Thana/Upazila*
Nearest Fire Station* Post Office* Indiacate the location of your factory on Google Maps
Ecnomic Zone Name Zone No
Road Name & No Plot No
Latitude Langitude
Description of what kind of combustible material will be stored/used/ processed / sorted /
purchased/ sold at the factory/warehouse:
Drop Down Menu
1
Drop Down Menu
Drop Down Menu Drop Down Menu Drop Down Menu
Enter a address for search in Map
D
3
4
2
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-24
+New Add
Building Information
Buiding
Types*
Area of
the
Building
(Sq.Feet)*
Number
of
Floor/
Storied
Useable
Floors
Is there
any
Founda
tion?
Access
to
Roof
Is there
any
Mezzanine
Floor?*
Own
Building/Rented
Building?*
Annual Price of Warehouse/ Factory (BDT)
Details of fire Prevention and security management of warehouse/factory (The building design and
Fire Fighting plan must be displayed to inspector officer and one copy should be given to inspector
officer)
If the applicant is a firm, the type of firm, name, status address of its board of
director/partner/managing committee
The width of the access road of Factory/Warehouse (Writedown details how many feet)
Description of Boundary of Building
Wheather there is No objection Certificate (Fire Fighting Related) for construction of multistoried
/commercial building from Fire Service and Civil Defence? *
Yes NO On Process
Invoice Information
Invoice Date * Invoice No* Amount of Money *
Name of the Bank * Name of the Branch *
Applicant Information
This information will help to identify the key/related person associated with this application
Name of the Applicant /Owner *
Email of the Applicant/Owner Mobile Number of the Applicant/Owner
5
6
7
8
9
10
0
11
0
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-25
Annexure -1
General Arrangement of Fire Fighting Floor Plan
1. Factory Forwarding Letter in the company’s latter head pad with the seal and representative sign.
2. Each and every letter & dimension as well as drawing should be visible.
3. The drawing cover page shall include Factory Name, Address, FSCD Enlisted Engineering Firms
name & Address
4. The Undertaking given by the Owner of the enlisted Consulting Firm on the prepared Fire Safety
Plan for approval of Fire Safety Plan
5. Each and every page of Fire Fighting Floor Plan to be sealed and signed by the following
designated person
I. Factory owner
II. Owner of the enlisted engineering Firm.
III. Engineer / Architect.
IV. Fire Professional.
N: B- The Fire Professional shall be considered who has completed minimum three-year service in Fire
Service and Civil Defiance and he must be the first-class officer.
The Items to be included in the Fire Fighting Floor Plan
1. Basement Floor Plan:
• Basement floor shall not be used as a store/warehouse except car parking
• Ventilation must be included in Basement Floor Plan
• Generator, Switchgear, Substation, Boiler Room shall not be kept in the basement except Pump
Room
• Ramp Slop of the basement must be 1:8
• Basement stair must have 20 meters consecutively
• Separation system must have in case of exceeding basement floor area 750 sqm
• Adequate lighting in the basement and automated sprinkler must have for each 100 square feet
2. Ground Floor Plan:
• Generator, Switchgear, Substation and Fire Control Room must be in the ground floor
• Generator, Switchgear, Substation and Fire Control Room must be separated with 4 hours fire rated
wall and 2 hours fire rated door and the size of the room along with KVA must be stated in the Plan
• Generator, Switchgear, Substation Room must be protected with F.M-200 Suppression System
• Fire Brigade connection at the ground floor having diameter (63 millimeter)
• All stairs shall be started from the ground floor and opened at the top floor
3. Other Floor Plans:
• One portable Fire Extinguisher for the floor size of 1000 sq. feet and exceeding 1000 sq. feet one
additional portable Fire Extinguisher must be kept in each floor
• Portable Fire Extinguisher shall be kept on the place of emergency way and the easily accessible
location
• The ration of DCP and CO2 shall be 70:30 inside the portable Fire Extinguisher
• Smoke/heat/multidetector must be installed in each floor
• Sprinkler Head must be installed 1 in each 100 sq. feet floor area and additional 1 for exceeding
100 sq. feet floor area
• Sufficient no. of emergency light, strobe light, alarm bell, manual call point and exit signage
arrangement must be installed in each floor
• One 38 mm hose reel connection for each 10000 sq. feet floor area and additional one 38 mm hose
reel connection must be installed for exceeding 10000 sq. feet
• Internal hydrant connection of having 63 mm dia along with Landing Bulb in the lobby of stair in
each floor
D. Building Construction SOP (Fire Safety)
Bangladesh Economic Zones Authority
D.2-26
4. Roof Plan:
• Drainage slop of rooftop rain water shall be 1:200
• Lightning Arrestor management must be on the roof (20 meters consecutively)
• Aviation Light must have in case of exceeding 150 feet
• Lift Machine Room and the marking way of entry alongside overhead water reservoir on roof
5. Safety Lobby:
• 4 hours fire rated wall with all fire stairs and fire lift and protected safety lobby with 2 hours fire
rated door must have. All safety lobby must have Positive Air Pressurized
6. Pump Room:
• 1 main, 1 standby and jockey pump must be in the Pump Room
• Pump GPM must be stated in plan
• The Pump Suction and Positive Suction must have in the Pump Room
7. Fire Stair:
• All fire stairs are protected with 4 hours fire rated wall and 2 hours fire rated door and Positive Air
Pressure
• The wide of the fire stair shall not be less than minimum 1.5m
8. Raiser Diagram:
• Standpipe Raiser Diameter must be included in the plan
• The area and capacity of the reservoir of the underground and overhead water
• Pump layout, fire brigade connection with ground floor, hose reel 38 mm at every floor and internal
hydrant point of 63mm must be included
9. Boiler Room:
• Boiler Room must be outside of the building and must be protected with 4 hours fire rated RCC
wall and 2 hours fire rated door
10. Road:
• The wide of front road of the building must be minimum 9 meter and minimum 4.5-meter-wide
road must be surrounding the building.
11. Assembly Area:
• Assembly area must be identified in the Fire Fighting Plan
N.B. Plan Scale shall be 1:100, A-2 size paper. Each building shall be named individually in case of more