Govt. of the People‘s Republic of Bangladesh
Prime Minister’s Office
Bangladesh Economic Zones Authority
Biniyog Bhaban (Level-7,8,9). E-6/B,
Agargaon, Sher-E-Bangla Nagar, Dhaka-1207
www.beza.gov.bd
Record Number: 03.07.0000.000.036.06.0070.24.49 Date: 26 Jul 2026
Subject: Final Inspection report of NICCA BANGLADESH CO., LTD. at Bangladesh Special
Economic Zone.
Record of Final Inspection
Project Name: NICCA BANGLADESH CO., LTD.
Plot no. / Name of EZ: LOT NO. C6 /BSEZ
Date and Time of Inspection: (9:30-11:30) 16/07/2026
Name of Attendants for Inspection:
No. Name Position
1 Md. Helal Ahmed Deputy Secretary (P & D), Convenor of Building Committee
(BEZA)
2 Mohsena Siddika Executive Architect, Member Secretary of Building Committee
(BEZA)
3 Salman bin Kamal Executive Architect, DoA and Member of Building Committee
(BEZA)
4 Osman Gani Deputy Assistant Director, FSCD
5 Md. Sarowar Mahmud OSS Expert (Building Construction), JICA Project Team/ BEZA
6 Md. Dulal Hossain OSS Expert (Fire Safety & Utility), JICA Project Team/ BEZA
7 Md. Hasanul Islam OSS Expert (Environment), JICA Project Team/ BEZA
8 Lumbine Chakma OSS Expert (Environment), JICA Project Team/ BEZA
General Information:
Plot Information
Land Area: 13602 SQM
Building Area (MGC): 4531 SQM
Nature of Facility: Industrial Warehouse
Kind of Construction: New
Major Structure: Prefabricated Steel
Number of Building: 03
Approval Status
Building Permit: BP-
2024021511011ba4ae30
ECC: Applied for renewal
Effectiveness Certificate:
Observations after Final Inspection:
No. Inspection Issues Observations
1. Building Construction Ground Coverage: Inspection carried out as per the approved
drawings. The total built up area is under the maximum
allowable limit. But future extension areas need to be
specified in the as-built drawing.
Setback: As per the approved drawings, all the setbacks
checked and found satisfactory.
Floor Layout: As per the approved drawings, floor layout plan
checked and found satisfactory except miss match at plinth
level height. It was observed that the plinth level of
warehouse building and road level are same.
Green Space: In as built drawing soak able green area needs
to be separately mentioned.
Disable Toilet: Disable toilet missing. It needs to be
constructed as per approved drawing.
Continue - 1 of 4
2. Environmental Issue The facility obtained Environment Clearance Certificate
(ECC). However, no production activities were observed
during the site visit, despite a production plan having
been submitted as part of the ECC application. It was
observed that they changed their business plan (now
only warehouse), which is not reflected as per the
approved ECC.
The facility has a Johkasou (Jokaso) system installed for
sewage treatment and we found it as functional.
We did not find any waste management activities which is
mentioned in the approved ECC like pre-treatment of the
liquid waste.
As no production activities were in operation at the time of
the visit, no industrial waste management system or
production-related environmental management practices
could be assessed.
3. Fire Safety Issue in
terms of Effectiveness
Both Active and Passive Fire protection systems found
satisfactory.
Recommendations:
Future extension areas need to be specified in the as-built drawing.
20% Green area should be shown in the revised drawing & mention in the calculation.
Open drains should be covered & stagnent water should be removed from floor drain inside the
industry.
It is advised to amend the project clearance certificate for the change in business plan.
It is advised to provide proper marking at ground floor level of warehouse building in order to
specify walkways.
Disable Toilet needs to be constructed as per approved drawing.
------------------------------
(Convener, Building Committee)
Inspection Photos:
Initial discussion before starting the inspection Inspection carried out as per approved drawings
Continue - 2 of 4
Inside of main warehouse building Space for future expansion (bare ground)
Fire door installed as per approved drawings Fire safety arrangements at utility building
সংযুিসমূহঃ
(1) 1
(2) 2
26-07-2026
Md. Helal Ahmed
Director and convenor, building
construction and occupancy committee
Distribution (Not in the order of seniority):
1. Executive Architect, Division-9, Circle-3, Department of Architecture.
2. Sub Devisional Engineer, Design Division-2, Public Works department.
3. Deputy Inspector General, Safety Section, DIFE.
4. Assistant Director, Warehouse Setion, Directorate of Fire Service and Civil Defence.
5. Managing Director, NICCA BANGLADESH CO., LTD..
Record Number 03.07.0000.000.036.06.0070.24.49/1 (3) Date: 26 Jul 2026
Continue - 3 of 4
Copy for Kind Information and Necessary Action: (Not in the order of seniority):
1. Executive Member ( কালীন িত ), Office of the Executive Member (Planning & Development), Banglad
esh Economic Zones Authority.
2. Director General, Director General (Planning & Development) Wing, Bangladesh Economic Zones Aut
hority.
3. Director General, Investment Promotion Wing, Bangladesh Economic Zones Authority.
Continue - 4 of 4