Engineer’s Comment by EAC-RFA-356A dated
24 Apr 2022 Contractor’s Reply
General
-PDF Page 74, 91, 115, 129, 142, 146, 150, 154,
158, 162, 166, 171, 176, 181, 185, 189, 249,
260, 262, 264, and 285; name, signature and
date is missing for “Received on behalf of
Contractor”
PDF Page 75, 92, 139, 143, 147, 151, 155, 159,
163, 167, 172, 177, 182, 186, 250 and 254;
name, signature and date is missing for
“Received on behalf of Engineer”
- Name, signature and date are confirmed for “Received on
behalf of Contractor” and “Received on behalf of Engineer” .
Item No.: 1110
-PDF page no 46; it needs Bank seal/stamp for
payment evidence. Please attach the supporting
documents for the mentioned customs reference.
- The supporting documents for the mentioned customs
reference have been attached.
Item No.: 2100
-PDF page no 88-90 and 105-107, it needs the
Engineers signature for Area IB volume
calculation.
- Engineers signature for Area IB volume calculation has
been confirmed.
Item No.: 2200 & 3400
-PDF page no. 109 and 111; Please revise the
volume quantity as per the supporting
documents.
-Volume quantity has been revised according to attached
documents.
Item No.: 2.18
-Please attach the materials test reports and
cylinder test reports from (BUET/BIT) for
concrete.
-BUET test reports have been attached .
Item No.: 2.19
- PDF page no 245, 246, 247 and 248; please
revise the drawing references -Drawing reference nos. have been revised.