Business Plan
Dhaka Mass Rapid Transit Development Project
Line 1(CP03) General Untied DMCTL Tunnel Segment
/Subconstructor Announcement Bids and Contracts Construction
Line 1(CP04) General Untied DMCTL Tunnel Segment
/Subconstructor Announcement Bids and Constracts Construction
Line 1(CP05) General Untied DMCTL Tunnel Segment
/Subconstructor Announcement Bids and Constracts Construction
Line 1(CP06) General Untied DMCTL Tunnel Segment
/Subconstructor Announcement Bids and Constracts Construction
Line 1(CP07
+CP08) General Untied DMCTL Viaduct Segment and erection
/Prime Constructor Announcement Bids and Constracts
Line5(CP03) General Untied DMCTL Viaduct Segment and erection
/Prime Constructor Announcement Bids and Constracts
Line5(CP04) General Untied DMCTL Tunnel Segment
/Subconstructor Announcement Bids and Constracts
Line5(CP05) General Untied DMCTL Tunnel Segment
/Subconstructor Announcement Bids and Constracts
Line5(CP06) General Untied DMCTL Tunnel Segment
/Subconstructor Announcement Bids and Constracts
The Matarbari Port Access Road Development Project
Access Road General Untied RHD Viaduct Segment and erection
/Subconstructor Announcement Bids and Constracts Construction
Chattogram-Cox's Bazar Highway Improvement Project
Highway General Untied RHD Viaduct Segment and erection
/Subconstructor (Undecided)
The Matarbari Port Access Road Development Project
(Project Outline)
Chattogram-Cox's Bazar Highway Improvement Project
(Project Outline)
Aug Sep Oct Nov Dec
2022=>
Feb Mar Apr May Jun Jul Jan
Procurement Owner Scope
Aug Sep Oct Nov Dec
2021=>
Jan Feb Mar Apr May Jun Jul
The objective of the Project is to achieve smooth cargo transportation between Matarbari Port and Chattogram by improving roads at congested town area along the National Highway No.1, thereby contributing to improvement of logistics in Bangladesh and to the
economic growth of the surrounding area.
The objective of the Project is to strengthen the port logistics capacity of Bangladesh by constructing a deep sea port at Matarbari area in Chittagong Division, thereby contributing to acceleration of logistics with neighboring countries.
2023=>
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Project name
Dhaka Urban Traffic
Improvement Project
(Line 5 North Line)
Business summary
Today‘ s Agenda
• 1. Project outline
• 2. Project implementation schedule
• 3. Construction package
• 4. Construction schedule (provisional)
• 5. Construction outline
• 6. Future schedule
1. Project overview
• Dhaka MRT network diagram Project status list (as of 2021.4)
1. Project overview
• Route outline
1. Project overview
• Photo along the route
2. Project implementation schedule
Note) The schedule is subject to change in the future.
3. Construction package (provisional)
4. Construction schedule (provisional)
5. Construction outline
CP-01: Depot construction work
CP-01: Depot construction work
5. Construction outline
Geological profile
The filling sand is assumed to be dredged sand on the Meghna River.
5. Construction outline
CP-02: Depot building construction
CP-02: Depot building construction
Sewage / wastewater
treatment facilities
Test run line
Warehouses Feeder
substation
General administration
building/ Driving Command
Power receiving substation
5. Construction outline CP-03: Main line construction work (viaduct)
Standard cross section Elevated part image (from Route 6)
5. Construction outline CP-03: Main line construction work (elevated station)
Station length: 180m
Relative platform
Standard cross section
5. Construction outline
CP-04-06: Main line construction work (underground station / tunnel)
Standard cross section
Outer diameter 6.7 m (inner diameter 6.1 m)
Single line parallel / column tunnel
Mud pressure shield method
5. Construction outline
CP-04-06: Main line construction work (underground station / tunnel)
Underground station cross section * Reverse winding method using RC continuous wall
2nd floor station 3rd floor station 4th floor station
5. Construction outline
CP-04-06: Main line construction work (underground station / tunnel)
5. Construction outline
CP-04-06: Main line construction work (underground station / tunnel)
5. Construction outline
CP-07: Railway system
5. Construction outline
CP-08: Vehicle / depot equipment
Line 6 vehicle appearance
5. Construction outline
Wiring schematic Elevated section
Underground section
Underground section
Underground section Elevated section
5. Construction outline
Gabtoli bus terminal maintenance plan
No. 5 North Line Station
Station entrance 1
Station entrance 2
Road alignment correction
5. Construction outline Temporary bus terminal (Gabtoli station under construction)
Gabtoli Bus Terminal
Bus terminal temporary relocation site
(Currently Line 6 construction yard)
6. Future schedule
1. Basic design (~ June 2021)
• Examination of the outline shape of the structure
• Examination of basic specifications of railway systems and rolling stock
2. Detailed design (until February 2023)
• Detailed structure design
• Creation of bid books (drawings / Technical Specification)
• Examination of construction plan (construction yard, detailed construction
schedule)
• Examination of Japanese technology (spec-in)