The original file is kept in the office. This is the text saved from it.
1 page
100%
FLAG POLE
GREEN AREA GREEN AREA
R O A D
EP
EP
1 5 10 12
13 15
送風恒温乾燥機
上皿天秤 pH測定器 精密天秤
B型粘度計
恒温槽
恒温水槽 純水装置
ガードナー ハーゼン
恒温槽 恒温槽
ドラフトチャンバー
冷蔵庫 薬品庫 薬品庫
洗面台
作業台
器具保管庫 器具乾燥機 廃液保管庫
書庫
ハロゲン
スターラー
屈折率計
デスク デスク
60℃ 5℃&45℃ 25℃
BOP6,300mm
BOP6,300mm
BOP6,300mm
BOP6,300mm
Compressor
Buffer Tank
Vacuum Pump
Salt Water Tank
BW TANK
BW PUMP
Receiver Tank
Recycled water drainage (gutter)
Drainage(gutter)
BOP1,000mm
BOP1,500mm
BOP2,500mm
BOP5,000mm
BOP500mm
BOP500mm
BOP500mm
BOP5,000mm
BOP500mm
BOP0mm
BOP2,500mm
SCR switch VAC switch
BW Switch
Water
Softener
EP
R O A D
GREEN AREA
GREEN AREA
GREEN AREA
LEGEND :
: BM = PL+6.140
(PL±00) = ACTUAL GROUND LEVEL
FL±0.00 = PL+6.953
GREEN
GREEN
COVER DRAIN
GREEN
GREEN
COVER DRAIN
PL+6.273
PL+6.289
PL+6.361
PL+6.382
PL+6.354
PL+6.421
PL+6.348
PL+6.272
PL+6.339
PL+6.342
ELECTRIC POLE
PL+6.374
(PL+6.373)
(PL+6.873)
3% (PL+6.953)
BENCH MARK
(PL+6.140)
GUARD
HOUSE
23.10m²
PL+6.433
PL+6.438
PL+6.435
LEGEND :
(PL+6.410)
N
Lot No. C6, Bangladesh Special Economic Zone (BSEZ), Sonpara, Panchrukhi Via Rupganj Araihazar
Narayanganj-1460 Bangladesh Tel: +880255033391
18
Production Process:
Process 1: The vacuum pump is used to create a vacuum inside the vessel. This is done by removing the air
from the vessel. Once the vessel is under vacuum, the raw materials can be drawn into the vessel.
Process 2: The raw material A and B are injected into the vessel through the raw material charging nozzle.
The raw material A and B are typically a liquid. It is important to note that the raw material A
and B are NON-DG, which means that it is not a dangerous good.
Process 3: Agitate and mix the raw materials to combine at room temp.
Process 4: Insert raw material C (NON-DG) from sampling nozzle. The raw material C is typically a liquid.
Process 5: Agitate and mix the raw materials to combine at room temp.
Process 6: Soft water is added to the vessel through a counter. The soft water is typically at room
temperature.
Process 7: Agitate and mix the raw materials to combine at room temp.
Process 8: Sampling from sampling nozzles for midterm inspection.
Process 9: The vessel is pressurized using a compressor. This pressure is needed to fill the drums with the
finished product. The pressure inside the vessel forces the product into the drums. Once the
drums are filled, the product is ready to be shipped to customers.