No. | Drawing sets | Checking Item | Dwg No | BSEZ check | Remarks
1 | Master plan | Contents | Set back indication | Yes
Check points | No structures or improvements inside setback area fronting streets and/or neighboring lot except below (a) to (m). | Yes
(a) Flag poles in setback area | Yes
(b) Any underground structures such as underground water reservoir, pipelines and conduits in setback area | Yes
(c) Landscaping in setback area | Yes
(d) Access roads and sidewalks from common streets (no roofs allowed) in setback area | Yes
(e) Fences subject to Article 19 in setback area | Yes
(f) Gates and guardhouses used solely for security purposes in setback area | Yes
(g) Manhole whose size is not exceeding 1,500mm*1,500mm in setback area | Yes
(h) Facility for exterior and security lighting, subject to Article 21 | Yes
(i) Utility pipelines should not exceed the height of solid masonry wall of fence. | Yes
(j) Parking place without roof, subject to Article 18 | Yes
(k) Rainwater drainage in setback area | Yes
(l) Controller panel of septic tank without roof in setback area | Yes
(m) Spirit House/Shrine or any other structure for the purpose of religion in setback area The size of Spirit House/Shrine shall not exceed 3 meters (Length) x 3 meters (Width) x 3 meters (Height) including base slab. | Yes
No structures or improvements inside setback area fronting outer boundary except only below (c) and (e). | Yes
(c) Landscaping in setback area fronting the outer boundary | Yes
(e) Fences in setback area fronting the outer boundary | Yes
The total coverage of Landscaping is more than 20% of the Lot. | Yes
Landscaping lines fronting Primary Street is more than five (5) meters | Yes
Landscaping lines fronting outer boundary is more than four (4) meters from the end of dike | Yes
Landscaping lines fronting a neighboring Lot is more than three (3) meters | Yes
No structures or improvements including parking space without roof structure inside landscaping area except above(a) to (i) | Yes
Total building coverage of building “footprint” is less than sixty per cent (60%) | Yes
Floor-to-area ratio is less than one hundred eighty per cent (600%) | Yes
2 | General drawings of factory Structure | Contents | drawings of every floor plan, sections, and elevations. | Yes
Check points | Soil test report received | Yes
3 | Fence drawing | Contents | Details of fencing is required (cross section of foundation, columns, beams etc.) | Yes
IR checkpoints | The fence is located on the boundary/property line and fully enclosing the lot except exit and entrance | Yes
The fence is two point four (2.4) meters high from ground level along the internal road way | Yes
The Fences along Internal Roadways is open-type fences made of painted wrought iron bars | Yes
Tthe roadway fences matched with BSEZ refernce | Yes
Tthe roadway fences are kept upright by galvanized pipes anchored to the ground | Yes
The concrete or solid masonry footing is not higher than thirty (30) centimeters from ground level | Yes
There is not any concealing fences such as those constructed from bamboo, wooden or concrete block erected at the front of any property line facing the road | Yes
There is No barbed wire fence | Yes
The fence onto the top of the perimeter dyke to fully enclosing the Lot | Yes
The fence onto the top of the perimeter dyke is a type of solid fence and made of steel or similar material | Yes
The fence onto the top of perimeter dyke has at least one door | Yes
4 | Security and safety detail | Contents | Fire safety and lightning protection details | Yes
IR checkpoints | The tenant has provided fire alarm system and fire fighting system plan | Yes
The tenant has provided lightning arrester / protection design | Yes
The Tenant ensured that receptacles or outdoor trash containers are placed away from the neighboring premises and shall be designed and located so as not to be visible from the Internal Roadways | Yes
5 | Access road details | Contents | Details drawing of access road over buffer zone including Plan, section & elevation are required. | Yes
IR checkpoints | Access road marking in the All utility drawing with coordinates and its location complies with Exhibits 4. | Yes
Ensure adequate vertical clearance for utility pipelines and shared protection methods where necessary (concrete Grade , cover ≥50mm, reinforcement detials etc. are mentioned) | Yes
Road Pavement Concrete grade, thikcness, reber details are mentioned. The slope for water drainage on the access road is clearly indicated in the drawing. | Yes
Base, subbase, Subgrade Layer thickness, aggregate gradation, moisture conditioned, etc. are mentioned. | Yes
Interlocking blocks, curbstones, and tiles are matched with the existing BSEZ materials, which is also reflected in the drawing. | Yes
Walkway marking is provided on the access road with color and dimensions (matched with BSEZ) | Yes
Details of protection reconstruction of BSEZ ,bufferzone structures such as manhole, box-culvert, etc. | Yes
Details of cover material, Load bearing capacity calculation for road slab thickness | Yes
6 | Sign | Contents | Details of permanent sign and temporary sign | Yes
IR checkpoints | The Tenant have specific approval for signs or other advertising devices | Yes
The Tenant's sign only identifies the name, logo, business and products of the Tenant | Yes
The Tenant's signs Are not extended above the top of the building to which they are affixed or placed on | Yes
The Tenant's signs attached to the building and is not erected individually | Yes
The Tenant's sign is not devised or constructed so as to rotate, gyrate, blink or move in any animated fashion | Yes
The Tenant's sign is not located closer than six (6) meters to any neighboring premises | Yes
There is any temporary sign for construction period | Yes
7 | Rainwater Drainage | Contents | Drawings including but not limited to Layout plan, Connection detail (Cross section, elevation and othe required drawing for connection points) , final manhole (Including sedimentation pit, screen net and grease trap) | Yes
IR checkpoints | Connection point is clearly marked on the All Utility Drawing shared by BSEZ. | Yes
Layout (plan view) of the total plot drainage system is provided, indicating flow direction and slope. Invert level of the new pipe matches the culvert bottom level (no reverse slope). And Minimum pipe slope ≥ 1% is maintained to ensure self-cleaning velocity (> 0.6 m/s for stormwater). | Yes
Cutting area and reinforcement arrangement are clearly detailed, including connection with existing rebars (anchor rebar, cross rebar, and protection concrete). | Yes
Filling concrete strength is higher than the existing concrete (Non-shrink grout or micro-concrete is preferred). Waterproofing method is specified. Two-coat application (e.g., Nitobond SBR + Vandex Super or equivalent cementitious waterproofing). | Yes
Adequate vertical clearance for other utilities is ensured. Lean concrete or sand-cement bedding is provided below HDPE/UPVC pipes. | Yes
The final manhole with sedimentation pit including trash trap is within the Lot | Yes
The trash trap just before discharging to BSEZ’s drain system is installed with (1) screen net to catch floating objects and (2) grease trap to effectively catch oily substance | Yes
The tenant is enclosed all drains within the Lot and also between the boundary and the common drain in the design as per Exhibit 5 | Yes
The tenant connects its drainage system to BSEZ’s drainage facility only, not to BSEZ’s manhole | Yes
Rain water discharge calculation sheet for the connection points | Yes
8 | Water Supply | Contents | including but not limited to Layout plan, Connection detail (Cross section, elevation and othe required drawing for connection points) | Yes
IR checkpoints | Connection point/Valve Pit number marked on the all utility drawing shared by BSEZ | Yes
Water demand and storage have been provided and are in compliance with the required capacity. | Yes
Cross-sections, elevations, and other required drawings for the connection point are provided. | Yes
Material specifications for pipes, valves, fittings, bolts, and gaskets are clearly mentioned in the drawings | Yes
There is no any water wells or similar facilities on any portion of the Lot. The tenant only use water supplied through BSEZ’s common water supply pipeline | Yes
The connection point is in accordance with the Exhibit 5 | Yes
There is any rainwater re-use system, and it is appropriate | Yes
If yes, there is 2 set of water meter in that system deisgn | Yes
9 | Waste water | Contents | including but not limited to Layout plan, Connection detail (Cross section, elevation and othe required drawing for connection points) , final manhole (Including sedimentation pit, screen net and grease trap) | Yes
IR checkpoints | Wastewater connection to the BSEZ manhole is clearly marked in the All Utility Drawings. The Tenant connects to the BSEZ Common Wastewater Discharge Pipeline | Yes
Cross-sections, elevations, and other required drawings for the connection point are provided. | Yes
Cut opening location is properly considered: which is At least 200 mm away from any manhole corner to avoid stress concentration, Cutting is proposed on a flat wall panel, not near vertical or corner joints and Existing manhole condition has been assessed for cracks, corrosion, and water infiltration. | Yes
Proper and adequate reinforcement details are provided. | Yes
Filling concrete strength is greater than the existing manhole wall strength( Non-shrink grout or micro-concrete is preferred). Waterproofing method is specified. | Yes
Invert level of the new pipe matches the culvert bottom level to avoid reverse slope. Minimum pipe slope ≥ 1% is maintained to ensure self-cleaning velocity (≥ 0.6 m/s for wastewater; 0.75 m/s preferable). | Yes
Adequate vertical clearance for utility pipelines is ensured, and shared protection methods are provided where necessary. Lean concrete or sand-cement bedding is provided below HDPE/UPVC pipes. | Yes
The tenant has wastewater pit with top cover and inspection manhole within the Lot | Yes
The Tenant has water-stop-valve or water-stop-plate inside the inspection manhole | Yes
The tenants' wastewater discharge satisfies the standards (Exhibit 7) set out in Internal Regulation | Yes
The Tenant has the septic tank or similar facility for domestic wastewater to ensure that the levels of such pre-treated wastewater | Yes
Sewage discharge amount calculation sheet for the connection points | Yes
10 | Electrical layout | Contents | including but not limited to Layout plan, level compared to FGL and Connection detail, | Yes
IR checkpoints | All exterior and security lighting is compatible and harmonious with the Improvements and Bangladesh Special Economic Zone | Yes
All electrical lines for exterior and security lighting for Lots along the Primary Street is located underground | Yes
Tenant's power is supplied through BSEZ’s common power supply | Yes
The connection point is in accordance with the Exhibit 6 | Yes