Project Understanding ......................................................................................... 2
Purpose of the Topographic Survey....................................................................... 2
Reconnaissance Survey ...................................................................................... 2
Establishment of Survey Control .......................................................................... 3
Total Station Traverse and Orientation .................................................................. 3
Survey Grid and 20 m Level Detailing .................................................................... 3
Additional Ground Level Survey ........................................................................... 4
Survey of Existing Physical Features..................................................................... 4
Survey of Drainage and Terrain Features ............................................................... 4
Breakline Survey ................................................................................................. 5
Field Data Collection Using Total Station .............................................................. 5
Field Quality Control ........................................................................................... 5
Data Processing .................................................................................................. 6
Contour Preparation ............................................................................................ 6
Preparation of Topographic Base Map................................................................... 6
Survey Deliverables ............................................................................................ 7
Survey Workflow ......................................................... Error! Bookmark not defined.
Conclusion ......................................................................................................... 7
Annexure ............................................................................................................ 8
Annexure 1: Location Map of the Plot ............................................................................ 9
Annexure 2: Survey Work Flow & Schedule ................................................................. 10
......................................................................................................................... 10
2
Project Understanding
Lide Bangladesh Tex2le Science & Technology Co., Ltd. is proposing to establish a tex2le manufacturing
factory at Plot C14 within the Bangladesh Special Economic Zone (BSEZ). The project site covers
approximately 50,955 m² (5.0955 ha) and is located along Road 7 of the BSEZ development.
The proposed development comprises several industrial and suppor2ng facili2es, including finishing,
dyeing and weaving sheds, a sub-sta2on, steam boiler room, hazardous chemical storage facili2es and
passage/corridor areas. The proposed development includes reinforced concrete and steel structures
with different building configura2ons and storeys, with an indicated total floor area of approximately
39,628 m².
Considering the scale of the proposed industrial development, an accurate topographic survey is
required to establish the exis2ng ground condi2ons, eleva2ons, drainage characteris2cs and physical
features of the project site. The survey informa2on will provide an essen2al base for site planning,
building layout, grading, drainage design, road and u2lity planning, earthwork es2ma2on and
coordina2on with the proposed factory development.
Purpose of the Topographic Survey
The purpose of the survey is to establish an accurate horizontal and ver2cal representa2on of the
exis2ng project site using Total Sta2on.
The survey will par2cularly focus on:
• Establishing survey control points and a reliable site reference system.
• Surveying the en2re approximately 50,955 m² project area.
• Collec2ng ground levels at 20 m intervals.
• Iden2fying varia2ons in exis2ng ground eleva2on.
• Mapping exis2ng roads, drains, structures, boundaries and other physical features.
• Iden2fying exis2ng high points, low points, slopes and drainage paths.
• Preparing a detailed topographic base map for the proposed factory development.
Reconnaissance Survey
Prior to commencing detailed fieldwork, a reconnaissance survey will be conducted over the en2re
Plot C14 area.
The survey team will review the exis2ng site condi2ons, access arrangements, terrain characteris2cs,
surrounding Road 7 condi2ons and exis2ng physical features.
During reconnaissance, suitable loca2ons will be iden2fied for Total Sta2on control points and
benchmarks. Par2cular a_en2on will be given to exis2ng roads, drainage facili2es, site boundaries,
structures, u2lity installa2ons and areas where significant changes in eleva2on occur.
3
The reconnaissance survey will also establish the most suitable sequence for Total Sta2on observa2ons
to ensure complete coverage of the site.
Establishment of Survey Control
A survey control network will be established within and around the project site using Total Sta2on.
Stable and accessible loca2ons will be selected for control points. Each control point will be securely
marked and assigned a unique iden2fica2on number.
Where reliable exis2ng BSEZ control points or benchmarks are available, the survey will be connected
to those reference points. If such reference informa2on is not available, a suitable local coordinate and
level datum will be established in consulta2on with the client.
The control network will provide the reference framework for all subsequent boundary, level and
feature surveys.
Total Sta>on Traverse and Orienta>on
A Total Sta2on traverse will be established between the control points to provide consistent horizontal
and ver2cal reference throughout the project area.
At each Total Sta2on setup, the instrument will be carefully centred and levelled over the control point.
The sta2on coordinates and instrument height will be entered into the instrument, followed by
orienta2on to a known backsight point.
The traverse will be checked for angular and posi2onal consistency. Where possible, a closed or
connected traverse will be adopted to enable closure verifica2on.
Any significant discrepancy iden2fied during traverse checking will be inves2gated and corrected
before detailed topographic observa2ons are finalized.
Survey Grid and 20 m Level Detailing
A systema2c 20 m × 20 m grid will be established across the project site.
Considering the site area of approximately 5.0955 ha, the grid will provide a consistent framework for
collec2ng exis2ng ground levels throughout Plot C14.
At each grid intersec2on, the Total Sta2on will be used to observe the ground point and determine its
horizontal coordinates and Reduced Level.
Each surveyed point will be assigned a unique point number and recorded with the corresponding
Eas2ng, Northing and Reduced Level.
The 20 m grid will form the primary level-detailing system for the site. However, the grid will not be
considered sufficient by itself in areas where the ground surface changes significantly. Addi2onal
points will therefore be collected where required.
4
Addi>onal Ground Level Survey
Addi2onal ground levels will be collected between the regular 20 m grid points wherever necessary to
accurately represent the exis2ng terrain.
Par2cular a_en2on will be given to:
• Exis2ng high and low points.
• Changes in ground slope.
• Drainage channels and ditches.
• Road edges and shoulders.
• Exis2ng plaforms.
• Pond or water-body edges, if present.
This approach will ensure that the resul2ng digital terrain model accurately represents the exis2ng
ground surface.
Survey of Exis>ng Physical Features
All significant exis2ng physical features within the project site and relevant surrounding areas will be
surveyed using Total Sta2on.
The survey will include, where applicable:
• Plot C14 boundary.
• Road 7 and relevant road edges.
• Exis2ng access points.
• Boundary walls, fences and gates.
• Exis2ng buildings and structures.
• Drains and drainage channels.
• Culverts and crossings.
• U2lity poles and visible u2lity infrastructure.
• Exis2ng paved and hard-surfaced areas.
• Trees and significant vegeta2on.
• Water bodies and other natural features.
• Exis2ng ground plaforms and embankments.
Feature points will be recorded with appropriate descrip2ons or codes to facilitate prepara2on of the
final CAD drawing.
Survey of Drainage and Terrain Features
Considering the proposed industrial development, special a_en2on will be given to exis2ng drainage
characteris2cs.
5
The survey team will record the levels and loca2ons of visible drains, channels, culverts, low points
and other drainage-related features.
Where prac2cal, levels will be taken at the top and bo_om of embankments, drain edges and other
significant changes in eleva2on.
These observa2ons will assist in understanding the exis2ng surface-water flow direc2on and will
provide useful informa2on for future site grading and drainage design.
Breakline Survey
Breaklines will be surveyed wherever there is a dis2nct change in the direc2on or slope of the ground
surface.
Typical breaklines may include road edges, drain edges, embankment tops and bo_oms, ditches,
ridges, building plaforms and other terrain discon2nui2es.
The breakline informa2on will be incorporated into the digital terrain model to prevent unrealis2c
interpola2on between the 20 m grid points.
Field Data Collec>on Using Total Sta>on
The Total Station will measure horizontal angle, vertical angle and slope distance to the prism at each
observation point.
Based on the instrument setup and backsight orientation, the coordinates and elevation of each observed
point will be calculated and stored in the instrument data collector.
The survey team will systematically move the Total Station between established control points to ensure
complete coverage of the approximately 50,955 m² site.
Each instrument setup will be checked before observations continue, particularly where the survey
requires multiple station changes.
Field Quality Control
Quality control will be maintained throughout the field survey.
The following checks will be undertaken:
• Verifica2on of Total Sta2on centring and levelling.
• Verifica2on of instrument and prism heights.
• Checking of backsight orienta2on.
• Periodic re-observa2on of selected points.
• Checking of control-point consistency.
6
• Verifica2on of important ground levels.
• Checking of boundary and road-edge observa2ons.
• Review of drainage and terrain feature levels.
• Iden2fica2on and re-survey of abnormal or doubful observa2ons.
Field data will be reviewed during the survey so that any missing or inconsistent informa2on can be
corrected before demobiliza2on from the site.
Data Processing
Aker comple2on of the field survey, the Total Sta2on data will be downloaded and processed using
appropriate survey and CAD sokware.
The processing will include checking of coordinates, Reduced Levels, point numbers and feature
descrip2ons.
The processed survey points will then be used to develop the digital terrain model of Plot C14.
The model will incorporate the surveyed 20 m grid points, addi2onal spot levels and breaklines to
provide an accurate representa2on of the exis2ng ground surface.
Contour Prepara>on
Contours will be generated from the verified survey points and digital terrain model.
The contour interval will be selected considering the rela2vely large industrial site area, exis2ng terrain
varia2on and requirements of subsequent engineering design.
The generated contours will be checked against the surveyed ground levels, drainage features, high
points, low points and breaklines to ensure that they reasonably represent the actual site condi2on.
Prepara>on of Topographic Base Map
The final topographic base map will be prepared in CAD format and will provide a detailed
representa2on of the exis2ng site.
The drawing will generally include:
• Plot C14 boundary.
• Road 7 and relevant surrounding features.
• Survey control points.
• Benchmark informa2on.
• 20 m × 20 m grid points.
• Exis2ng ground Reduced Levels.
• Addi2onal spot levels.
• Contour lines.
7
• Exis2ng roads and access points.
• Exis2ng structures and facili2es.
• Drains and drainage features.
• U2lity features.
• Trees and significant vegeta2on.
• Embankments and other terrain features.
• Coordinate grid and north arrow.
• Drawing scale and legend.
The topographic base map will be suitable for overlaying the proposed factory buildings, roads,
u2li2es, drainage systems and other planned facili2es.
Survey Deliverables
The completed survey will provide the following:
• Detailed topographic survey plan of Plot C14.
• 20 m × 20 m ground level plan.
• Total Sta2on survey point database.
• Digital CAD topographic drawing.
• Survey control point and benchmark informa2on.
Conclusion
The proposed Total Sta2on-based topographic survey methodology will provide accurate informa2on
on the exis2ng ground levels, terrain characteris2cs, drainage features and physical features of the
approximately 50,955 m² Plot C14 site within BSEZ.
The systema2c 20 m × 20 m level detailing, supported by addi2onal spot levels and breakline
observa2ons, will provide an adequate basis for preparing the exis2ng ground model. The resul2ng
topographic survey will support the planning and engineering design of the proposed tex2le
manufacturing factory, including building layout, site grading, drainage, roads, u2li2es and earthwork
requirements.
8
Annexure
9
STAGE 1
STAGE 2
STAGE 1 (79.810 ha)
STAGE 2 (120.125 ha)
G
Location of-
Lide Bangladesh Textile Science & Technology Co., Ltd.
PROJ
PROJ
SITE
SITE
TOTA
STRU
BUILD
BUILD
NUMB
WOR
WOR
BUILD
D
1. BU
COVE
2. MIN
AREA
(GR
BARE
3. PA
SEM
4. MA
HEIG
BUILD
1. PH
SHED
2. PH
SHED
3.PHA
SHED
4.SUB
5.STE
ROOM
6.HAZ
7.PAS
CORR
SUBT
TOTA
TOTA
AREA
REGU
BUILD
TOTA
PROJECT SIGN-OFF & DRAWING INFORMATION
OWNER'S
NAME &
SIGNATURE:
ARCHITECT'S
SIGNATURE &
DETAILS:
Name: RAJUK REGISTRATION NO.
IAB MEMBERSHIP NO.
Address:
MOBILE: , EMAIL:
STRUCTURAL
DESIGN
ENGR. &
SIGNATURE:
Name: Ahammad Kabir
Structural Design Engineer, M/27263
IEB Registration # DMINB/CE- 0354
Cantt. Enlistment # DCB E-147
Mobile No.: +8801614 201 002
Lide Bangladesh Textile
Science & Technology
Co., Ltd.
Annexure 1: Loca2on Map of the Plot
10
Annexure 2: Survey Work Flow & Schedule