The original file is kept in the office. This is the text saved from it.
1 page
100%
BEZA::Bangladesh Economic Zones Authority
Application for Building Permit
Tracking ID : BP-000000000001 Submitted At : 22 Mar 2023 Current Status : PAID Current Desk :
Payment and Applicant Information
Name : Test Designation :
Phone No. : 1 Email : 1@1.1
Address :
1. General Information
Select Land Use Plan reference No: :
Company Name : Proposed: Messer's Nazmul and Co.
Name Of EZ : Bangabandhu Sheikh Mujib Shilpa Nagar
Phone No : +770455645223
Land Area (sqm) : 850001
Land Use Plan Approval No :
Obtained Land Use Plan Offline :
Name Of Applicant :
Company Address :
Location : Bangabandhu Sheikh Mujib Shilpa Nagar,
Chattogram , Mirsarai, Feni
Email : nazmulfarhan@gmail.com
Plot No : 3415 Lobortis. Avenue Rocky Mount WA
48580
Number of Building :
Land Use Plan Approval Date :
2. Building information
3. Required Documents for attachment
1. Site Layout Plan :
2. Individual Building Drawings ( floor layout plan, section, elevation) :
3. Finish Schedule and Specific quantity :
4. 3D View indicating building names (Axonometric view of plot) :
5. Design drawings and documents related to Sewage Treatment Plant / Septic
Tank & Effluent treatment plant with capacity :
6. Machinery Installation Plan :
7. Copy of Approved Hazardous storage/fuel/ CNG tank Plan :
8. Structural Drawings (certified by structural engineer) :
9. Soil Investigation Report :
10. Calculation Report (for purpose of reference) :
11. Copy of Approved Fire Fighting Floor Plan (NOC)*
a. NOC :
b. Approved Drawing of Fire Fighting Floor Plan :
12. Electro-mechanical & Plumbing Plan :
13. Copy of ECC/EIA approval :
14. Digital Survey report identifying plot size and dimension (with soft copy) :
15. Chart of BEZA rules2017 :
16. U.O. Note/Approval of offline Land Use plan :
Additional/Recommended Attachment :
File Name Uploaded File
Information of Licensed Engineers/Architects
4. Terms and Conditions
1. The information and documents I provided are accurate, authentic, and valid.
2. Any misinformation and invalid documents in the application may be terminated.
3. The working days shall be counted from the day of the complete and final submission of the SOP [complete
information and attached documents].
4. A shortfall message shall be sent to the applicant in case of an incomplete submission. If the applicant
does not respond in due course, the submitted application shall be discarded.
I accept and agree to the Terms and Conditions :
1 / 1