The original file is kept in the office. This is the text saved from it.
1 page
100%
[Land Use Plan Permit]
Land Use Plan Permit (Required information for BEZA OSS)
1. Application for Land Use Plan [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name Of Applicant
2 | Present Address
3 | Location
4 | Economic Zone Name
5 | Company Name
6 | Usage Type of Proposed Building
7 | Plot No
8 | Land area (sqm)
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks
1 | Purpose of Construction
2 | Type of Structure
3 | Storey | Floor number of buidling
4 | Max Height (In foot/meter)
5 | Building area (sqm) | (sqm)
6 | Ground Coverage (%)
7 | Total Floor Area (sqm) =
8 | Floor Area Ratio (FAR)
9 | Date of Commencement | DD/MM/YYYY
10 | Date of Completion | DD/MM/YYYY
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks
1 | Location and plot map of EZ | Plot Location with size in EZ
2 | Individual Plot Layout Plan Which is showing position of building, internal road, green area, setback line, gate and gate house, Fence and other facilities. | Must be prepared as per BEZA building construction rules.
3 | Utility Connection Plan (connection route of Electricity, Water, Sewage, Rainwater, Fence etc) | Drawing of connection route of Electricity, Water, Sewage, Rainwater, Fence etc
4 | Utility Connection Plan (AutoCad 2007) | Software generated.
5 | Land Use Plan (AutoCad 2007) | Software generated.
6 | Original Master plan (As Approved) | Same as No. 1
7 | FORM-BP-01-A (BEZA applciation form)
Note: Need to apply through BEZA OSSC. For land use permit 7 working days needed. All maps/drawing must be signed, seal and attested by IEB and IEA approved Engineer and Architect.
[Fire Fighting Floor Plan (NOC)]
Application for Approval of Fire Fighting Floor Plan (NOC) (Required information for BEZA OSS)
1. General Information [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name of the owner of Building
2 | Mobile Number of Building owner
3 | Email ID of Building owner
4 | Owner’s Address:
5 | Location and size of proposed land or plot
6 | Nearest Fire Station
7 | Name of Economic Zones
8 | Municipality/Union Parishad
9 | Block/ Section/ Zone No
10 | Plot No
11 | Holding No
12 | Area of Land
13 | Type of Land
14 | District and police station / Upazila of the proposed building
15 | Details of existing structures on land or plots
16 | Name of main road adjacent to plot
17 | Width of main road to plot (meter)
18 | Length of plot connecting road
19 | Width of plot connecting road
20 | Length of Proposed internal road
21 | Width of Proposed internal road (including turning circle)
22 | Description of the surroundings of plot/land: | At North+South+East+West
23 | Detailed description of proposed building Building Classification for use
24 | Height of building
25 | Number of Floors
26 | Number of Basement Floor
27 | Area of each Mezzanine Floors (Sq. Meter)
28 | Area of each Basement Floors
29 | Area of each Semi Basement Floors
30 | Total area of all floors
31 | For Residential Building, total residences/apartments and flats:
32 | For mixed category use the description of floors that will be used for each category
33 | Is there any high voltage electric line above the plot and both vertical and horizontal distance from the proposed plot?
34 | Name and address and registration number of the architect and engineer concerned with the construction work | Name of the Architect & Engineer & Address and Registration No
3. Required document (attachment)
Sl. No. | Name of documents | Remarks
1 | Application Form (electronic) through online; (FORM-FL-01)
2 | Copy of Letter of Allotment (LOA) issued by BEZA/Zone Developers
4 | Copy of Investment Clearance from BEZA
5 | Copy of Approved Land use Plan.
6 | Floor Layout Plan with Elevation and Section
7 | Google Map (To be highlights proposed plot in Google Map by mentioning the company name)
Fire Fighting Floor Plan; Four (04) sets in book format | (The Plan must be prepared by enlisted engineering firms in FSCD and the details procedure has been mentioned in the Annexure-1).
Description of what kind of combustible material will be stored/used/processed/sold at the proposed factory. | (According to prescribed Form; Form-FL-02).
Copy of Membership certificate of architect/ Engineers who is prepared Fire Fighting Floor Plan.
8 | The undertaking stating that the building shall be constructed by following Bangladesh National Building Codes (BNBC) and Fire Prevention & Extinction Act, 2003. | Treasury Stamp of BDT 300/-
9 | Other document and drawing required by BEZA OSS Centre.
Note: Need to apply through BEZA OSSC. - Fire Fighting Floor Plan must be prepared from enlisted engineering Firms by FSCD. The updated list of enlisted engineering firms available at FSCD website www.fireservice.gov.bd (Circular Section) - If the EZ developer has own “Internal Regulations for fire safety”, the applicant shall obtain an evidence of confirmation of the Fire Safety Plan from the EZ developer and attach to the application documents.
[Building Permit ]
Building Permit (Required information for BEZA OSS)
1. General Information [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name Of Applicant
2 | Present Address
3 | Location
4 | Economic Zone Name
5 | Company Name
6 | Usage Type of Proposed Building
7 | Plot No
8 | Land area (sqm)
9 | Phone No :
10 | Email:
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks
1 | Purpose of Construction
2 | Type of Structure
3 | Storey
4 | Max Height (In foot/meter)
5 | Number of building
6 | Land area (sqm)
7 | Floor area (sqm) | GF: ___________ 1F: _________ 2F: __________ 3F: __________ 4F: _________ 5F: __________
8 | Building area (sqm) | (sqm)
9 | Ground Coverage (%) | (%)
11 | Floor Area Ratio (FAR)
12 | Date of Commencement | DD/MM/YYYY
13 | Date of Completion | DD/MM/YYYY
Information of Licensed Engineers/Architects
Sl. No. | Required information | Details | Remarks
A: REGISTERED ARCHITECT
1 | Name:
2 | License No.:
3 | License Year:
4 | Licensed by:
5 | Company Name:
6 | Address:
7 | Tel /e-mail/NID:
B: STRUCTURE ENGINEER
1 | Name:
2 | License No.:
3 | License Year:
4 | Licensed by:
5 | Company Name:
6 | Address:
7 | Tel /e-mail/NID:
C: EQUIPMENT ENGINEER / (FIRE FIGHTING SYSTEM)
1 | Name:
2 | License No.:
3 | License Year:
4 | Licensed by:
5 | Company Name:
6 | Address:
7 | Tel /e-mail/NID:
Documents to be attached for each:
1 | Curriculum vitae:
2 | Copy of license of Engineer:
3 | Documents of Experience:
4 | Copy of License of Company
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks
1 | Application Form (FORM-BP-02-A)
2 | Architectural Drawing | Project Description (refer to FORM-BP-02-A no.1), Floor area ratio (FAR) calculation
4 | Digital Survey Report identifying Plot size and dimensions
5 | Floor Plans (floor and Roof Plan) | Floor plan and Roof plan separately
6 | All Elevations and Sections (Min.3 nos. major section with soft copy) | Outlook of building from outside.
7 | 3D View indicating building names (Axonometric view of plot) | JPG format
8 | Sewage Treatment Plant & Effluent treatment plant with capacity
9 | Copy of Approved Hazardous storage/ Fuel Tank / CNG Tank plan
10 | Machinery Installation Plan | Machinery layout and installation plan with production flow chart
11 | Chart of BEZA rules 2017 (Building) (FORM-BP-02-C)
12 | Building materials and typical finishing materials list (Name & quantity) | For imported construction material BOQ is required.
13 | Structural Analysis | Structural Drawings (certified by structural engineer)
14 | Soil Investigation Report
15 | Calculation Report
16 | Electrical Plan
17 | Mechanical and Plumbing Plan
18 | Copy of Approved Firefighting floor Plan (NOC) | BEZA approval copy
19 | Information of Licensed Engineers/ Architects (FROM-BP-02-B)
20 | Engineer’s confirmation on compliance of BNBC Code | Engineer and Architect statement and attestation in each map.
21 | Copy of ECC (Green & Orange-A, B category) | DoE approval copy
Note: Need to apply through BEZA OSSC. For land use permit 30 working days needed. All map must be signed, seal and attested by IEB and IEA approved Engineer and Architect. Maps must be printed on Ammonia sheet blue Paper. The drawing scale must be 1:100. Total 3 sets of all documents must be submitted to BEZA.