Tracking No: PC-20260521105026150ceb Date: 01-Jul-2026
Managing Director / CEO
NAXIS BANGLADESH CO. LTD.
Lot No. A10, Bangladesh Special Economic Zone, Sonpara, Panchrukhi Via Rupganj, Araihazar, Narayanganj-1460,
Bangladesh
Bangladesh Special Economic Zone Limited, Narayanganj, Narayanganj Sadar
Subject: Approval for setting up a(n) Industry/Manufacturing in Bangladesh Special Economic Zone Limited
Dear MD/ CEO,
With reference to your Project Proposal received on 18-Jun-2026 , this is to inform you that the Authority is pleased to issue this
clearance subject to approval from competent authorities and compliance of all legal requirements of your project for setting up
a(n) Industry/Manufacturing in Bangladesh Special Economic Zone Limited, Narayanganj, Narayanganj Sadar on terms
and conditions as indicated below:
01. Name of the project : NAXIS BANGLADESH CO. LTD.
02. Products : List of Products: 1. RFID Tag; HS Code 8523521000 2. RFID Barcode sticker; HS Code 8523521000 3. Care
Label ; HS Code 5807100000 4. Woven Label; HS Code 5807100000 5. Laundry Label; HS Code 5807100000
6. Size Sticker; HS Code 3919909090 7. Paper Header; HS Code 4821100000 8. Hook; HS Code 3926909090
03. Cost of the project : 7.20 Million USD
04. Type of Investment: : 100.00 % Export Orient
0.00 % Domestic Orient
05. Type of Industry : A- Foreign Oriented
06. Annual production capacity : Care Label 52500000 Piece, Woven label 28000000 Piece, RFID tag 50000000
Piece, Laundry label 5600000 Piece, Size sticker 14500000 Piece, Barcode sticker
11000000 Piece, Paper header 11000000 Piece, Hook 8700000 Piece,
07. Employment : 105 persons including 2 foreign nationals
08. Status of the Company : Private Limited
09. Manufacturing Process : Manufacturing Process Flow: Import → Stock → Semi-finished goods → Stock
→ Printing → Inspection → Cutting → Encoding → Packing → Export Process
Description: This manufacturing workflow outlines an export-oriented, high-
precision production line for apparel accessories and smart tracking solutions
(including RFID tags, woven/care labels, and stickers). 1. Import & Stocking:
Base raw materials—including RFID inlays, paper substrates, specialized tape
ribbons, threads, inks, and adhesives—are imported and securely cataloged in
primary inventory. 2. Semi-Finished Processing: Raw materials undergo initial
conversion or structural assembly (such as bonding inlays to paper or preparing
fabric backing) to create semi-finished goods, which are temporarily held in
intermediate stock. 3. Printing: Materials are fed into high-speed printing lines
where product data, branding, variable barcodes, or care instructions are applied
using specialized inks and gloss oils. 4. Inspection & Cutting: Printed rolls or
sheets undergo strict quality control inspections to verify print clarity and material
integrity before being precision-cut into individual units (tags, labels, hooks, or
headers). 5. Encoding: For smart products (RFID Tags, Stickers, and Laundry
Labels), the integrated chips are electronically programmed with unique digital
identifiers and verified for readability. 6. Packing & Export: Finished items are
Generated Date: 01-Jul-2026 1 of 4
systematically sorted, packed to prevent transit damage, and moved directly to
logistics for international export.
10. Area of land/SFB to be allotted : 18385.016098264 Square Meters plot in Lot No. A10, Bangladesh Special
Economic Zone, Sonpara, Panchrukhi Via Rupganj, Araihazar, Narayanganj-1460,
Bangladesh at Araihazar
11. Machinery and equipments required to be imported for the project valued approximately at 2,889,750.00 USD only on the
terms and conditions acceptable to this Authority.
12. Machinery to be imported for the project (as per list enclosed with the Project Proposal) shall be New. However, the import of
old or used Machinery and equipment is allowed upon the fulfillment of the conditions laid down in the import Policy Order.
Prior approval of the Authority shall be required for the import/shipment of machinery from abroad.
13. Before procurement of Machinery and building-materials from abroad you are required to submit 3 (three) sets of price
quotations from reputed machinery suppliers or in case of procurement of machinery from manufacturer, 1 (one) set of price
quotation along with catalogues etc. of the machinery for approval of the Authority.
14. The company will have to:
a. maintain the ratio of export and domestic sale within 100.00 : 0.00 of entire product of its factory;
b. submit monthly reports to the Authority on the progress of implementation of the project;
c. commission the project in the allotted land space within a period of twelve months failing which the Authority may revoke this
permission;
d. furnish such other data on the project to this Authority and to any other agency as may be required;
e. obtain work permits / permission of the Authority prior to entry for any foreign nationals on employment in the project;
f. submit to this Authority, the audited Financial Statement for every financial year within 4(four) months from the closure of
each financial year of the company;
g. comply with the provisions of minimum wages of the workers as declared by the government from time to time and the EPZ
Workers Welfare Association and Industrial Relations Act, 2010 (Act no-43 of 2010) (as amended from time to time by the
Authority) in regards to wages, employment, salary, leave, discipline, health, compensation, insurance and other benefits to the
employees engaged for work in your enterprise;
h. comply with the rules pertaining to environment protection, pollution control and effluent treatment and take necessary safety
measures against possible fire hazards;
i. comply with all laws, by-laws, rules, regulations, directives of the government and of this Authority which are in force or
which may be issued from time to time in future;
j. comply with provisions of the “Principles and Procedures Governing Setting up of Industries in EZ”;
k. obtain prior approval of the Authority in case the company decides to appoint a Managing Agent or transfer the shares of the
company;
l. the company shall have to submit actual Investment, export, domestic sales, employment information to the Authority and/ or
with other government agency(s) in quarterly basis.
15. The construction of the factory building and other civil works shall commence immediately and no later than three (3) months
from the date of issuance of the Building Permit. Commercial operations must begin within two (2) years from the date of
Building Permit issuance.If the company fails to commence construction of the factory building within three (3) months from
the date of Building Permit issuance, the land lease agreement may be terminated without further notice.The building shall
conform to the conditions and specifications laid down in the Bangladesh Economic Zones (Construction of Building) Rules,
2017. Prior approval of the building plan must be obtained from the Authority.
16. The company shall bear the cost of Services and Regulatory permit fees as prescribed by the Authority from time to time
17. No waste/old materials will be allowed to import as raw materials.
Generated Date: 01-Jul-2026 2 of 4
18. In the event of your failure to set up the unit within the stipulated time or infringement of any rules and regulations or
violation of any of the above terms and conditions, the Authority may revoke the permiss
19. This permission is not transferable.
20. In case of investments in the Private Economic Zone (PEZ), this permission shall be valid until expiration of the license
awarded in favor of that PEZ by Bangladesh Economic Zones Authority.
21. If you agree with the terms and conditions contained in this letter along with those contained in the BEZA Act, Rules, Policies,
Guidelines, SROs, Circulars, Office orders etc. you are requested to proceed for signing the land lease agreement with the
Developer/ Operator of with intimation to the Authority. Thanking and assuring you of our best cooperation at all times.
Copy for Information to
a. Managing Director ,
b. Commissioner, Customer Bond...
c. ..............................
d. ..............................
Annexure - 1
Infrastructure Initial Period Regular Operation Period at maximum capacity
Power (in KW/H) 312.50 312.50
GAS (in M3) Per day 0 0
Water (in M3) Per day 0.00625 0.00625
Central ETP (in M3) Per day 0 0
Annexure - 2
Details of Machinery Country of Origin Name of The vendor Value Value
Currency State
Guillotine Germany Heidelberg 60,000 USD new
Applicator China Wing Singa 70,000 USD new
Laminator China Newstar Machinery 60,000 USD new
Digital Printer China Konica 30,000 USD new
Diecutter China Kamgold 119,000 USD new
Encoder United States Winwin 30,000 USD new
Inkjet Printer (Hangtag) China Zhilian 110,000 USD new
Inkjet Printer (Barcode Sticker) China Zhilian 56,000 USD new
Plate maker China AMSKY 46,000 USD new
Rotary printer China Golden fai 11,000 USD new
Baking box China Golden fai 2,000 USD new
Cut w Inspec. China Zeeyia 49,000 USD new
Friction test machine Japan Cosmo 7,500 USD new
Heat transfer press machine China Hashima 3,000 USD new
Jangle test machine China ESPEC 4,700 USD new THIS IS A COMPUTER GENERATED PERMIT. SO SIGNATURE IS NOT REQUIRED.
Generated Date: 01-Jul-2026 3 of 4
Baking box China Yiheng 630 USD new
Washing machine China Meidi 100 USD new
Formalin test machine China HITACHI 6,400 USD new
Formalin test machine China HITACHI 6,400 USD new
Sewing machine China Jack 200 USD new
Rotational viscometer China Sunny hengping 320 USD new
Color bleeding test box China Waigou 100 USD new
Weaving machine Switzerland Muller 58,000 USD new
Sizing machine China MAXTEX 63,000 USD new
Sliting machine China MAXTEX 41,000 USD new
Cutting machine China MAXTEX 18,000 USD new
Metal Inspection Machine China LIANXIN 4,400 USD new
5+1 offset Machine Germany Heidelberg 1,610,000 USD new
Varnishing Machine China Delagen 88,000 USD new
Lamination Machine China Wencheng 120,000 USD new
Guillotine China Huayue 95,000 USD new
Diecutter China Xuheng 120,000 USD new
Generated Date: 01-Jul-2026 4 of 4