The original file is kept in the office. This is the text saved from it.
1 page
100%
Required Documents for the Layout Plan Approval from Department of Explosive for for Lide Bangladesh Textile Technology Co., LTD.
SL | Information / Document Required | Status | Remarks
Company & Contact Information
1 | Company Name | Received
2 | Registered Office Address | Received
3 | Factory Address | Received
4 | Factory Contact Number
5 | Email Address
6 | Contact Person Name & Designation
Registration & Licensing Numbers
7 | Company Incorporation/Registration No. | Received
8 | TIN No. (Company) | Received
9 | Trade License No. & Validity | Pending
10 | BIN No. | Received
Business & Chemical Storage Details
12 | Nature of Business / Manufacturing Process | Received
13 | Chemical Name | Toluene and Ethyl Acetate | Toluene and Ethyl Acetate
14 | Annual Requirement (MT/year) | Received
15 | Daily and M+onthly Requirement (MT/day) | Ethyl Acetate: Toluene:
16 | Maximum Quantity Stored at One Time | 37.5tons TOL 0.25tons Ethyl Acetate per month will be stored at one time
17 | Method of Storing | Please explain.
18 | Container type | Drum / IBC / tank
19 | Capacity of each container
20 | Distance from store to property boundary/other buildings
21 | Storage building details
Required Documents
1 | Overall Site Layout / Site Plan | Drawing team will provied
2 | Proposed Chemical Storage Warehouse Layout Plan | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
3 | Elevation Drawing of the Storage Warehouse | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
4 | Section Drawing of the Storage Warehouse | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
5 | Loading & Unloading Layout of the Storage Warehouse | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
6 | Fire-Fighting Layout of the Storage Warehouse | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
7 | Electrical / Hazardous-Area Layout of the Storage Warehouse | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
8 | Drainage / Spill Containment Layout of the Storage Warehouse | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
9 | Distance/Setback Drawing of the Storage Warehouse | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
10 | Storage/Rack Arrangement Drawing showing maximum storage capacity | Drawing team will provied | Neeed to prepare as per Petroleum Rules, 2018.
Note: Please fill the yellow protion.