Required Documents and Information Sheet for Approval of Fire Fighting Floor Plan (Drawing NOC) for Lide Bangladesh Textile Technology Co., LTD.
Section | Field / Parameter Name | Input Type | Remarks (if Any)
Applicant Details | Username | Lide Bangladesh Textile Technology Co., LTD. (representated by Mr. Dong De)
Phone No | 8617753321984
Email | davidDong@zibotex.com
User Address | 60 Paya Lebar Road, No. 04-16, Paya Lebar Square, Singapore 409051
Local Representative Details | Name
Phone No
Email
NID No.
Thana / Upazila
Address
Plot Location | Division of the Proposed Building | Lot No. C14, Bangladesh Special Economic Zone (BSEZ), Sonpara, Panchrukhi Via Rupganj, Araihazar, Narayanganj1460, Bangladesh
District of the Proposed Building
Thana / Upazila of the Proposed Building
Building No
Road No
Address (dag, mouza, plot no, zone name)
Number of Buildings
Proposed Building Details | Class of building use | Industry
Type of building use | Industry
Building Height (m) / Floor
Number of Floors
Number of Stairs
Number of Basement Floors
Number of Mezzanine Floors
Number of Semi basement Floors
Area of Each Floor (Sq. Meter)
High-voltage electric line over proposed plot?
Distance of high-voltage line from plot (H & V)
Total number of apartments (Residential)
Description of floors used by each class (Mixed)
Adjacent Road Description | Name of main street adjacent to plot | BSEZ Road
Width of main road adjacent to plot (m)
Length of plot connecting road (m)
Plot Connection Road width (m)
Recommended Road length inside plot (m)
Plot Boundaries | What's in the North?
What's in the South?
What's in the East?
What's in the West?
Nearby Fire Station | Division
District
Thana
Fire Station
Construction Personnel | Name and address of the Engineer
Engineer's registration number
Name and address of the Architect
Architect registration number
Substation Info | Floor where substation will be installed
Capacity of Electric substation in KVA
Proper ventilation system for temp control? | Yes / No
Area around transformer secured with 4ft net? | Yes / No
Possibility of flood/rainwater entering? | Yes / No
Door and wall fire-rated? | Yes / No
Rubber mats properly installed inside? | Yes / No
Provision for "Inert Gas Fire System"? | Yes / No
Design shown on separate sheet with legends? | Yes / No
Required Documents | 1.Architectural Drawing (Cad File) | Drawing Team will provide
2.Electrical SLD (Cad file) | Drawing Team will provide
3.LPS Drawing (Cad File) | Drawing Team will provide
4.Owner NID or passport with contract details information. | Lide will provide
5.Owner representee persona details | Lide will provide
6. Production process flow charts. | Lide will provide
8. The undertaking in Treasury Stamp of BDT 300/- stating that the building shall be constructed by following Bangladesh law | TCF will prepare.
9. Copy of Letter of Allotment (LOA) issued by BEZA/Zone Developers | Lide will provide
10. Copy of Investment Clearance from BEZA | TCF have
11. Copy of Approved Land use Plan | Drawing Team will provide
12. Floor Layout Plan with Elevation and Section | TCF will prepare.
13. Google Map (To be highlights proposed plot in Google Map by mentioning the company name) | TCF will prepare.
14. Fire Fighting Floor Plan; Four (04) sets in book format (The Plan must be prepared by enlisted engineering firms in FSCD and | TCF will prepare.
15. Description of what kind of combustible material will be stored/used/processed/sold at the proposed factory. | Lide will provide
Note: Please fill the yellow protion. Please share the requied documents that need to shared by Lide Bangaldesh. TCF will collect the other documents from Drawing Team.