Land Use Plan Permit (Required information for BEZA OSS)
1. Application for Land Use Plan [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name Of Applicant | We got alredy
2 | Present Address
3 | Location
4 | Economic Zone Name
5 | Company Name
6 | Usage Type of Proposed Building
7 | Plot No
8 | Land area (sqm)
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks
1 | Purpose of Construction | New construction
2 | Type of Structure | Please select
3 | Storey | e.g. 2 | Floor number of buidling
4 | Max Height (In foot/meter) | For example 10 meter | Constractor will provide
5 | Building area (sqm) | sqm | Constractor will provide (sqm)
6 | Ground Coverage (%) | Constractor will provide
7 | Total Floor Area (sqm) = | Constractor will provide
8 | Floor Area Ratio (FAR) | Constractor will provide
9 | Date of Commencement | 7/21/24 | DD/MM/YYYY (Expected date is fine)
10 | Date of Completion | 7/21/25 | DD/MM/YYYY (Expected date is fine)
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks
1 | Location and plot map of EZ | Plot Location with size in EZ
2 | Individual Plot Layout Plan Which is showing position of building, internal road, green area, setback line, gate and gate house, Fence and other facilities. | Must be prepared as per BEZA building construction rules.
3 | Utility Connection Plan (connection route of Electricity, Water, Sewage, Rainwater, Fence etc) | Drawing of connection route of Electricity, Water, Sewage, Rainwater, Fence etc
4 | Utility Connection Plan (AutoCad 2007) | Software generated.
5 | Land Use Plan (AutoCad 2007) | Software generated.
6 | Original Master plan of BSEZ (As Approved) | BEZA will provide.
7 | FORM-BP-01-A (BEZA applciation form) | TCF will prepare.
Note: Need to apply through BEZA OSSC. For land use permit 7 working days needed. All drawings must be signed and sealed by a certified engineer.
[TCF-Legal]
Land Use Plan Permit (Required information for BEZA OSS)
1. Application for Land Use Plan [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name Of Applicant | We got alredy
2 | Present Address
3 | Location
4 | Economic Zone Name
5 | Company Name
6 | Usage Type of Proposed Building
7 | Plot No
8 | Land area (sqm)
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks
1 | Purpose of Construction | New construction
2 | Type of Structure | Please select
3 | Storey | Floor number of buidling
4 | Max Height (In foot/meter) | Constractor will provide
5 | Building area (sqm) | Constractor will provide (sqm)
6 | Ground Coverage (%) | Constractor will provide
7 | Total Floor Area (sqm) = | Constractor will provide
8 | Floor Area Ratio (FAR) | Constractor will provide
9 | Date of Commencement | DD/MM/YYYY (Expected date is fine)
10 | Date of Completion | DD/MM/YYYY (Expected date is fine)
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks
1 | Location and plot map of EZ | Plot Location with size in EZ
2 | Individual Plot Layout Plan Which is showing position of building, internal road, green area, setback line, gate and gate house, Fence and other facilities. | Must be prepared as per BEZA building construction rules.
3 | Utility Connection Plan (connection route of Electricity, Water, Sewage, Rainwater, Fence etc) | Drawing of connection route of Electricity, Water, Sewage, Rainwater, Fence etc
4 | Utility Connection Plan (AutoCad 2007) | Software generated.
5 | Land Use Plan (AutoCad 2007) | Software generated.
6 | Original Master plan of BSEZ (As Approved) | BEZA will provide.
7 | FORM-BP-01-A (BEZA applciation form) | TCF will prepare.
Note: Need to apply through BEZA OSSC. For land use permit 7 working days needed. All drawings must be signed and sealed by a certified engineer.