[Land Use Plan Permit]
Land Use Plan Permit (Required information for BEZA OSS) ※緑箇所をご記入ください。
1. Application for Land Use Plan [Part: 1]
Sl. No. | Required information | Details | Remarks | 担当 | 依頼先 | 確認事項
1 | Name Of Applicant 申請者の名前 | 提出済のため、作業なし。
2 | Present Address 現住所
3 | Location位置
4 | Economic Zone Name経済特区名
5 | Company Name 会社名
6 | Usage Type of Proposed Building 提案建物の用途種類
7 | Plot No 区画番号
8 | Land area (sqm) 土地面積
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks | 担当 | 依頼先 | 確認事項
1 | Purpose of Construction 建設の目的 | Business | 内田 | 清水建設様
2 | Type of Structure 構造物の種類 | Reinforced Concrete | 内田 | 清水建設様
3 | Storey 階数 | 2 | 内田 | 清水建設様
4 | Max Height (In foot/meter)最大高さ (フィート/メートル) | 10.7 | 内田 | 清水建設様
5 | Building area (sqm) 建築面積(平方メートル) | 7,362.13 | (sqm) | 内田 | 清水建設様
6 | Ground Coverage (%) 地表被覆率 (%) | 36.81 | 内田 | 清水建設様
7 | Total Floor Area (sqm) , numeric only,総床面積(平方メートル)、数値のみ、 | 8,358.13 | 内田 | 清水建設様
8 | Floor Area Ratio (FAR) 容積率(FAR) | 0.4279 | 内田 | 清水建設様
9 | Date of Commencement 開始日 | 2024.10.01 | DD/MM/YYYY | 内田 | 清水建設様
10 | Date of Completion完成日 | 2025.08.15 | DD/MM/YYYY | 内田 | 清水建設様
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks | 担当 | 依頼先 | 確認事項
1 | Location and plot map of EZ
2 | Individual Plot Layout Plan | Which is showing position of building, internal road, green area, setback line, gate and gate house, Fence and other facilities. | 内田 | 清水建設様
3 | Utility Connection Plan (connection route of Electricity, Water, Sewage, Rainwater, Fence etc) | 内田 | 清水建設様
4 | Utility Connection Plan (AutoCad 2007) | 内田 | 清水建設様
5 | Land Use Plan (AutoCad 2007) | 内田 | 清水建設様
6 | Original Master plan (As Approved) | なし
7 | FORM-BP-01-A (BEZA applciation form)
Note: Need to apply through BEZA OSSC. For land use permit 7 working days needed.
[Fire Fighting Floor Plan (NOC)]
Application for Approval of Fire Fighting Floor Plan (NOC) (Required information for BEZA OSS) ※緑箇所をご記入ください。
1. General Information [Part: 1]
Sl. No. | Required information | Details | Remarks | 担当 | 依頼先 | 確認事項
1 | Name of the owner of Building | 喜多村
2 | Mobile Number of Building owner | 喜多村
3 | Email ID of Building owner | 喜多村
4 | Owner’s Address: | 喜多村
5 | Location and size of proposed land or plot | 喜多村
6 | Nearest Fire Station | 喜多村
7 | Name of Economic Zones | 喜多村
8 | Municipality/Union Parishad 自治体 | 喜多村
9 | Block/ Section/ Zone No | 喜多村
10 | Plot No | 喜多村
11 | Holding No | 喜多村
12 | Area of Land (Sq. Meter) | 喜多村
13 | Type of Land | 喜多村
14 | District and police station / Upazila of the proposed building | 喜多村
15 | Details of existing structures on land or plots | 喜多村
16 | Name of main road adjacent to plot | 喜多村
17 | Width of main road to plot (meter) | 喜多村
18 | Length of plot connecting road | 喜多村
19 | Width of plot connecting road | 喜多村
20 | Length of Proposed internal road | 内田
21 | Width of Proposed internal road (including turning circle) | 内田
22 | Description of the surroundings of plot/land: | At North + South + East + West | 内田
23 | Detailed description of proposed building Building Classification for use | 内田
24 | Height of building | 内田
25 | Number of Floors | 内田
26 | Number of Basement Floor | 内田
27 | Area of each Mezzanine Floors (Sq. Meter) | 内田
28 | Area of each Basement Floors (Sq. Meter) | 内田
29 | Area of each Semi Basement Floors (Sq. Meter) | 内田
30 | Total area of all floors | 内田
31 | For Residential Building, total residences/apartments and flats: | Office Area | 内田
32 | For mixed category use the description of floors that will be used for each category | 内田
33 | Is there any high voltage electric line above the plot and both vertical and horizontal distance from the proposed plot? | 内田
34 | Name and address and registration number of the architect and engineer concerned with the construction work | Name of the Architect & Engineer & Address and Registration No | 内田
3. Required document (attachment)
Sl. No. | Name of documents | Remarks | 担当 | 依頼先 | 確認事項
1 | Application Form (electronic) through online; (FORM-FL-01) | 喜多村
2 | Copy of Letter of Allotment (LOA) issued by BEZA/Zone Developers | 喜多村
4 | Copy of Investment Clearance from BEZA | 喜多村
5 | Copy of Approved Land use Plan. | 喜多村
6 | Floor Layout Plan with Elevation and Section | 内田
7 | Google Map (To be highlights proposed plot in Google Map by mentioning the company name) | 喜多村
Fire Fighting Floor Plan; Four (04) sets in book format | (The Plan must be prepared by enlisted engineering firms in FSCD and the details procedure has been mentioned in the Annexure-1). | 内田
Description of what kind of combustible material will be stored/used/processed/sold at the proposed factory. | (According to prescribed Form; Form-FL-02). | 内田
Copy of Membership certificate of architect/ Engineers who is prepared Fire Fighting Floor Plan. | 内田
8 | The undertaking stating that the building shall be constructed by following Bangladesh National Building Codes (BNBC) and Fire Prevention & Extinction Act, 2003. | Treasury Stamp of BDT 300/-
9 | Other document and drawing required by BEZA OSS Centre.
Note: Need to apply through BEZA OSSC. - Fire Fighting Floor Plan must be prepared from enlisted engineering Firms by FSCD. The updated list of enlisted engineering firms available at FSCD website www.fireservice.gov.bd (Circular Section) - If the EZ developer has own “Internal Regulations for fire safety”, the applicant shall obtain an evidence of confirmation of the Fire Safety Plan from the EZ developer and attach to the application documents.
[Building Permit ]
Building Permit (Required information for BEZA OSS) ※緑箇所をご記入ください。
1. General Information [Part: 1]
Sl. No. | Required information | Details | Remarks | 担当 | 依頼先 | 確認事項
1 | Name Of Applicant | 喜多村
2 | Present Address | 喜多村
3 | Location | 喜多村
4 | Economic Zone Name | 喜多村
5 | Company Name | 喜多村
6 | Usage Type of Proposed Building | 喜多村
7 | Plot No | 喜多村
8 | Land area (sqm) | 喜多村
9 | Phone No : | 喜多村
10 | Email: | 喜多村
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks | 担当 | 依頼先 | 確認事項
1 | Purpose of Construction | 内田
2 | Type of Structure | 内田
3 | Storey | 内田
4 | Max Height (In foot/meter) | 内田
5 | Number of building | 内田
6 | Land area (sqm) | 内田
7 | Floor area (sqm) | 内田
8 | Building area (sqm) | (sqm) | 内田
9 | Ground Coverage (%) | (%) | 内田
11 | Floor Area Ratio (FAR) | 内田
12 | Date of Commencement | DD/MM/YYYY | 内田
13 | Date of Completion | DD/MM/YYYY | 内田
Information of Licensed Engineers/Architects
Sl. No. | Required information | Details | Remarks | 担当 | 依頼先 | 確認事項
A: REGISTERED ARCHITECT
1 | Name: | 内田
2 | License No.: | 内田
3 | License Year: | 内田
4 | Licensed by: | 内田
5 | Company Name: | 内田
6 | Address: | 内田
7 | Tel /e-mail/NID: | 内田
B: STRUCTURE ENGINEER
1 | Name: | 内田
2 | License No.: | 内田
3 | License Year: | 内田
4 | Licensed by: | 内田
5 | Company Name: | 内田
6 | Address: | 内田
7 | Tel /e-mail/NID: | 内田
C: EQUIPMENT ENGINEER / (FIRE FIGHTING SYSTEM)
1 | Name: | 内田
2 | License No.: | 内田
3 | License Year: | 内田
4 | Licensed by: | 内田
5 | Company Name: | 内田
6 | Address: | 内田
7 | Tel /e-mail/NID: | 内田
Documents to be attached for each:
1 | Curriculum vitae: | 内田
2 | Copy of license of Engineer: | 内田
3 | Documents of Experience: | 内田
4 | Copy of License of Company | 内田
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks
1 | Application Form (FORM-BP-02-A) | 内田
2 | Architectural Drawing | Project Description (refer to FORM-BP-02-A no.1), Floor area ratio (FAR) calculation | 内田
4 | Digital Survey Report identifying Plot size and dimensions | 内田
5 | Floor Plans (floor and Roof Plan) | Floor plan and Roof plan separately | 内田
6 | All Elevations and Sections (Min.3 nos. major section with soft copy) | Outlook of building from outside. | 内田
7 | 3D View indicating building names (Axonometric view of plot) | JPG format | 内田
8 | Sewage Treatment Plant & Effluent treatment plant with capacity | 内田
9 | Copy of Approved Hazardous storage/ Fuel Tank / CNG Tank plan | 内田
10 | Machinery Installation Plan | Machinery layout and installation plan with production flow chart | 内田
11 | Chart of BEZA rules 2017 (Building) (FORM-BP-02-C) | 内田
12 | Building materials and typical finishing materials list (Name & quantity) | For imported construction material BOQ is required. | 内田
13 | Structural Analysis | Structural Drawings (certified by structural engineer) | 内田
14 | Soil Investigation Report | 内田
15 | Calculation Report | 内田
16 | Electrical Plan | 内田
17 | Mechanical and Plumbing Plan | 内田
18 | Copy of Approved Firefighting floor Plan (NOC) | BEZA approval copy | 内田
19 | Information of Licensed Engineers/ Architects (FROM-BP-02-B) | 内田
20 | Engineer’s confirmation on compliance of BNBC Code | Engineer and Architect statement and attestation in each map. | 内田
21 | Copy of ECC (Green & Orange-A, B category) | DoE approval copy | 内田
Note: Need to apply through BEZA OSSC. For land use permit 30 working days needed. All map must be signed, seal and attested by IEB and IEA approved Engineer and Architect. Maps must be printed on Ammonia sheet blue Paper. The drawing scale must be 1:100. Total 3 sets of all documents must be submitted to BEZA.