WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS
TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL
Lide Bangladesh Textile Technology Co., Ltd.
Entrance
Guard Room
Septic Tank
HV
Distribution
HV
Cab.
Transformer
1#
LV
Cab
PV Cab.
Duty Room
Generator
L5m×W2.2m×H2.4m
2#
1.3000
SW
SW SW SW SW SW SW SW SW
SW SW SW SW SW
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW
2% 2% 2% 2%
Storm Water
Line
Water Supply
Line
Electrical Line
Telecommunica-
tion Line
Pole
Foundation
TL TL
TL TL
Legend:
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW
WS WS WS WS
WS WS
WS
WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS
WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS
WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS
WS
WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS WS
WS WS WS
Sewage
Water
Drainage
Drainage Line
Box-Culvert
WORKSHOP
2F
Corridor (W8*H6)
2F
1F 1F
2F
1F
Corridor W8*H6
CP Underground Rainwater
Collecting Tank
Wastewater Treatment Plant 1680 ㎡
CP
CP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
Underground Rainwater
Collecting Tank
Community Area-1 (959sqm)
Community
Area-2
(1306sqm)
Community Area-3 (713sqm)
AREA- CALCULATION: CHART OF BEZA RULES 2017 (BUILDING)
PROJECT OUTLINE
PROJECT NAME Lide Bangladesh Textile Technology Co., Ltd.
SITE LOCATION C14
SITE AREA 50,955 sqm
TOTAL FLOOR AREA 39,628 sqm
STRUCTURE TYPE Reinforced Concrete & Steel
BUILDING & STORIES Varies
BUILDING HEIGHT Varies
NUMBER OF
WORKERS 396
WORKING SHIFT 3
BUILDING FLOOR AREA WITH COVERED AREA (IN DESIGN) - BEZA COMPLIANCE
DESCRIPTION
LOCAL REGULATION ACTUAL PLAN Remarks (if
any) (%) SQM (%) SQM
1. BUILDING
COVERAGE 60.00% 30,573.00 56.10% 28,585.97 ACCEPTABLE
2. MINIMUM SOAK AREA
(GREEN AREA + BARE +
COMMUNITY
GATHERING)
40.00% 20,382.00 43.90% 22,369.00 ACCEPTABLE
3. PARKING, ROAD &
SEMI PAVEMENT 20.00% 10,191.00 13.29% 6,772.98 ACCEPTABLE
4. MAXIMUM BUILDING
HEIGHT 14 m ACCEPTABLE
BUILDING OUTLINE & FLOOR AREA BREAKDOWN
BUILDING STRUCTURE STORIES GF (SQM) 1F(SQM) TOTAL AREA
(SQM)
1. PHASE I FINISHING
SHED RC + S 2 11,243.89 2,770.70 14,014.59
2. PHASE 2 DYEING
SHED RC + S 2 8,719.38 1,595.67 10,315.05
3.PHASE 3 WEAVING
SHED RC 2 6,675.86 6,675.86 13,351.72
4.SUB-STATION RC 1 277.20 277.20
5.STEAMED BOILER
ROOM RC 1 476.00 476.00
6.HAZCHAM STORAGE S 1 1,072.68 1,072.68
7.PASSAGE
CORRIDOR S 1 120.96 120.96
SUBTOTAL AREA 28,585.97 11,042.23 39,628.20
TOTAL FLOOR AREA 28,585.97
TOTAL BUILDING
AREA 39,628.20
REGULATORY RATIOS & EVALUATION SUMMARY
BUILDING COVERAGE RATIO 77.77% ACCEPTABLE
TOTAL FLOOR RATIO 72.14% ACCEPTABLE
PROJECT SIGN-OFF & DRAWING INFORMATION
OWNER'S
NAME &
SIGNATURE:
ARCHITECT'S
SIGNATURE &
DETAILS:
Name: Ar. Abu Anas Faisal
Architect
IAB Registration # F-012
Mobile No.: +8801711 614 551
DATE DRAWING TITLE SCALE
STRUCTURAL
DESIGN
ENGR. &
SIGNATURE:
Name: Engr. Ahammad Kabir
Structural Design Engineer, M/27263
IEB Registration # DMINB/CE- 0354
Cantt. Enlistment # DCB E-147
Mobile No.: +8801614 201 002
Name : De Dong
Designation: Chairman
Lide Bangladesh Textile
Technology Co., Ltd.
20.08.2026
DWG. NO.
1:500 SITE PLAN (ALL UTILITY) LIDE-LUP-DWG-0003