Lide Bangladesh Textile Technology Co., Ltd.
MASTER LAYOUT PLAN
Etrance
Guard Room
WORKSHOP
2F
Corridor (W8*H6)
Septic Tank
HV
Distribution 2F
1F 1F
2F
1F
Corridor W8*H6
CP Underground Rainwater
Collecting Tank
1.3000
Wastewater Treatment Plant 1680 ㎡
CP
CP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
Underground Rainwater
Collecting Tank
Community Area-1 (959sqm)
Community
Area-2
(1306sqm)
Community Area-3 (713sqm)
Legend
Drainage Line
Box-Culvert
Water Supply
Line
Sewage
Water
Drainage
Telecommuni-
cation Line
Land
Boundary
Line
Green Space
including
Community
Gathering
Internal
Road
STP
Steel
Structure
Concrete
Structure
Dimension
TP Truck
Parking
Area
2 Floor
Building
1 Floor
Building
Entrance
2F
1F
CP Car
Parking
Area
AREA- CALCULATION: CHART OF BEZA RULES 2017 (BUILDING)
PROJECT OUTLINE
PROJECT NAME Lide Bangladesh Textile Technology Co., Ltd.
SITE LOCATION C14
SITE AREA 50,955 sqm
TOTAL FLOOR AREA 39,628 sqm
STRUCTURE TYPE Reinforced Concrete & Steel
BUILDING & STORIES Varies
BUILDING HEIGHT Varies
NUMBER OF
WORKERS 396
WORKING SHIFT 3
BUILDING FLOOR AREA WITH COVERED AREA (IN DESIGN) - BEZA COMPLIANCE
DESCRIPTION
LOCAL REGULATION ACTUAL PLAN Remarks (if
any) (%) SQM (%) SQM
1. BUILDING
COVERAGE 60.00% 30,573.00 56.10% 28,585.97 ACCEPTABLE
2. MINIMUM SOAK AREA
(GREEN AREA + BARE +
COMMUNITY
GATHERING)
40.00% 20,382.00 43.90% 22,369.00 ACCEPTABLE
3. PARKING, ROAD &
SEMI PAVEMENT 20.00% 10,191.00 13.29% 6,772.98 ACCEPTABLE
4. MAXIMUM BUILDING
HEIGHT 14 m ACCEPTABLE
BUILDING OUTLINE & FLOOR AREA BREAKDOWN
BUILDING STRUCTURE STORIES GF (SQM) 1F(SQM) TOTAL AREA
(SQM)
1. PHASE I FINISHING
SHED RC + S 2 11,243.89 2,770.70 14,014.59
2. PHASE 2 DYEING
SHED RC + S 2 8,719.38 1,595.67 10,315.05
3.PHASE 3 WEAVING
SHED RC 2 6,675.86 6,675.86 13,351.72
4.SUB-STATION RC 1 277.20 277.20
5.STEAMED BOILER
ROOM RC 1 476.00 476.00
6.HAZCHAM STORAGE S 1 1,072.68 1,072.68
7.PASSAGE
CORRIDOR S 1 120.96 120.96
SUBTOTAL AREA 28,585.97 11,042.23 39,628.20
TOTAL FLOOR AREA 28,585.97
TOTAL BUILDING
AREA 39,628.20
REGULATORY RATIOS & EVALUATION SUMMARY
BUILDING COVERAGE RATIO 77.77% ACCEPTABLE
TOTAL FLOOR RATIO 72.14% ACCEPTABLE
PROJECT SIGN-OFF & DRAWING INFORMATION
OWNER'S
NAME &
SIGNATURE:
ARCHITECT'S
SIGNATURE &
DETAILS:
Name: Ar. Abu Anas Faisal
Architect
IAB Registration # F-012
Mobile No.: +8801711 614 551
DATE DRAWING TITLE SCALE
STRUCTURAL
DESIGN
ENGR. &
SIGNATURE:
Name: Engr. Ahammad Kabir
Structural Design Engineer, M/27263
IEB Registration # DMINB/CE- 0354
Cantt. Enlistment # DCB E-147
Mobile No.: +8801614 201 002
Name : De Dong
Designation: Chairman
Lide Bangladesh Textile
Technology Co., Ltd.
20.08.2026
DWG. NO.
1:500 MASTER LAYOUT PLAN LIDE-LUP-DWG-0002