The original file is kept in the office. This is the text saved from it.
1 page
100%
Land Use Plan Permit (Required information for BEZA OSS)
1. Application for Land Use Plan [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name Of Applicant | Mr. Kotaro Takeuchi
2 | Present Address | Lot No. C6, Bangladesh Special Economic Zone (BSEZ), Sonpara, Panchrukhi Via Rupganj Araihazar, Narayanganj-1460 Bangladesh
3 | Location | Araihazar (BSEZ)
4 | Economic Zone Name | Bangladesh Special Economic ZoneLimited
5 | Company Name | NICCA BANGLADESH CO., LTD.
6 | Usage Type of Proposed Building | Industrial
7 | Plot No | LOT NO. C6
8 | Land area (sqm) | 5504.538972
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks
1 | Purpose of Construction | New construction
2 | Type of Structure | Other | Pre-febrecated and Reinforced concrete hybrid
3 | Storey | 2
4 | Max Height (In foot/meter) | 8.95
5 | Building area (sqm) | 4,374.31 | (sqm)
6 | Ground Coverage (%) | 32.16
7 | Total Floor Area (sqm) , numeric only, | 4,635.71
8 | Floor Area Ratio (FAR) | 34.08
9 | Date of Commencement | 02/04/2024 | DD/MM/YYYY
10 | Date of Completion | 23/01/2025 | DD/MM/YYYY
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks
1 | Location and plot map of EZ
2 | Individual Plot Layout Plan | Which is showing position of building, internal road, green area, setback line, gate and gate house, Fence and other facilities.
3 | Utility Connection Plan (connection route of Electricity, Water, Sewage, Rainwater, Fence etc)
4 | Utility Connection Plan (AutoCad 2007)
5 | Land Use Plan (AutoCad 2007)
6 | Original Master plan (As Approved)
7 | FORM-BP-01-A (BEZA applciation form)
Note: Need to apply through BEZA OSSC. For land use permit 7 working days needed.