Building Permit (Required information for BEZA OSS)
1. General Information [Part: 1]
Sl. No. | Required information | Details | Remarks
1 | Name Of Applicant | Mr. Kotaro Takeuchi
2 | Present Address | Lot No. C6, Bangladesh Special Economic Zone (BSEZ), Sonpara, Panchrukhi Via Rupganj Araihazar, Narayanganj-1460 Bangladesh
3 | Location | Araihazar (BSEZ)
4 | Economic Zone Name | Bangladesh Special Economic ZoneLimited
5 | Company Name | NICCA BANGLADESH CO., LTD.
6 | Usage Type of Proposed Building | Industrial
7 | Plot No | LOT NO. C6
8 | Land area (sqm) | 5504.538972
9 | Phone No : | 01735901417
10 | Email: | ko-takeuchi@niccachemical.com
2. Building Information [Part: 2]
Sl. No. | Required information | Details | Remarks
1 | Purpose of Construction | New construction
2 | Type of Structure | Reinforced Concrete
3 | Storey | Need to be filled up by construction company. (Green Column)
4 | Max Height (In foot/meter)
5 | Number of building
6 | Land area (sqm)
7 | Floor area (sqm) | GF: ___________ 1F: _________ 2F: __________ 3F: __________ 4F: _________ 5F: __________
8 | Building area (sqm) | (sqm)
9 | Ground Coverage (%) | (%)
11 | Floor Area Ratio (FAR)
12 | Date of Commencement | 1/2/24 | DD/MM/YYYY
13 | Date of Completion | 31/12/2024 | DD/MM/YYYY
Information of Licensed Engineers/Architects
Sl. No. | Required information | Details | Remarks
A: REGISTERED ARCHITECT
1 | Name:
2 | License No.: | Supported by CV & License
3 | License Year:
4 | Licensed by:
5 | Company Name:
6 | Address:
7 | Tel /e-mail/NID:
B: STRUCTURE ENGINEER
1 | Name:
2 | License No.: | Supported by CV & License
3 | License Year:
4 | Licensed by:
5 | Company Name:
6 | Address:
7 | Tel /e-mail/NID:
C: EQUIPMENT ENGINEER / (FIRE FIGHTING SYSTEM)
1 | Name:
2 | License No.: | Supported by CV & License
3 | License Year:
4 | Licensed by:
5 | Company Name:
6 | Address:
7 | Tel /e-mail/NID:
Documents to be attached for each:
1 | Curriculum vitae:
2 | Copy of license of Engineer:
3 | Documents of Experience:
4 | Copy of License of Company
3. Required document (attachment) [Part: 3]
Sl. No. | Name of documents | Remarks
1 | Application Form (FORM-BP-02-A)
2 | Architectural Drawing | Project Description (refer to FORM-BP-02-A no.1), Floor area ratio (FAR) calculation
4 | Digital Survey Report identifying Plot size and dimensions
5 | Floor Plans (floor and Roof Plan) | Floor plan and Roof plan separately
6 | All Elevations and Sections (Min.3 nos. major section with soft copy) | Outlook of building from outside.
7 | 3D View indicating building names (Axonometric view of plot) | JPG format
8 | Sewage Treatment Plant & Effluent treatment plant with capacity
9 | Copy of Approved Hazardous storage/ Fuel Tank / CNG Tank plan
10 | Machinery Installation Plan | Machinery layout and installation plan with production flow chart
11 | Chart of BEZA rules 2017 (Building) (FORM-BP-02-C)
12 | Building materials and typical finishing materials list (Name & quantity) | For imported construction material BOQ is required.
13 | Structural Analysis | Structural Drawings (certified by structural engineer)
14 | Soil Investigation Report
15 | Calculation Report
16 | Electrical Plan
17 | Mechanical and Plumbing Plan
18 | Copy of Approved Firefighting floor Plan (NOC) | BEZA approval copy
19 | Information of Licensed Engineers/ Architects (FROM-BP-02-B)
20 | Engineer’s confirmation on compliance of BNBC Code | Engineer and Architect statement and attestation in each map.
21 | Copy of ECC (Green & Orange-A, B category) | DoE approval copy
Note: Need to apply through BEZA OSSC. For land use permit 30 working days needed. All map must be signed, seal and attested by IEB and IEA approved Engineer and Architect. Maps must be printed on Ammonia sheet blue Paper. The drawing scale must be 1:100. Total 3 sets of all documents must be submitted to BEZA.