1 page
100%
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
S M T W S M T W S M T W S M T W S M T W
Required Information & Documents Collection Client 7 Days
Drafting Required Documents TCF 7 Days
Signature & Courier Client 15 Days
Obtain to the High Court Permission (Including Newspaper &
Donation based on high court order) (1. Drafting documents; 2.
Signature & Courier; 3. Application to Court; 4. Approval)
TCF & Authority 1.5 Months
Online Application to RJSC TCF 2 Days
Hard Copy Submission to RJSC TCF 2 Days
Obtain RJSC approval RJSC 1 Month
Application for certified copy TCF 1 Days
Obtain Certified Copy TCF 2 Days
2 3 4 5
MOA Clause Change
1st Month 2nd Month 3rd Month 4th Month
Note:
1. This is a predicted timeline.
2. If unusual situations arise it may take more time.
Work
Name Task / Flow ASSIGNED TO
Toyotsu Machinary & Engineering Bangladesh Limited
Work Details and Schedule for MOA Clause Change
Time
1
Sl. No. Name of Documents Remarks
1 Certificate of Incorporation TCF has
2 Certified copies of the MoA and Articles of Association (AoA) TCF has
3 Form XII (Updated) TCF has
4 Passport all Directors (For Foreigner) TCF has
5 NID (For Local) For application purpose who will represent in
the court.
6 Newspaper Publication As per Court Order
7 Donation Copy As per Court Order
8 Court Permission Copy After getting Court Order
Note: Additional documents may required as per Court.
Work Details and Schedule for MOA Change
Toyotsu Machinary & Engineering Bangladesh Limited
Supporting Required Documents List:
Sl. No. Name of Documents Mr. Kazuo Enosako Mr. Kenji Kanamori Local Representative Remarks
1 Notices and minutes from the EGM ✓ ✓ TCF will draft (need scan copy)
2 Memorandum of Association (MoA) ✓ TCF will draft (need original hard copy)
3 Form VIII ✓ TCF will draft (need original hard copy)
4 Application Letter ✓ TCF will draft (need original hard copy)
5 Forwarding Letter ✓ TCF will draft (need original hard copy)
6 Letter of authorization ✓ TCF will draft (need original hard copy)
7 Newspaper Publication ✓ TCF will draft as per Court Order
8 Affidafit ✓ ✓ TCF will draft as per Court Order
Toyotsu Machinary & Engineering Bangladesh Limited
Work Details and Schedule for MOA Change
Drafting Required Documents List:
Note: Additional documents may required as per Authority.
Sl. No. Authorities Name Fees/Speed Fee
1 Lawyer Fee 80,000/- (Approximate)
2 Newspaper Publication 50,000/- (Approximate)
3 Donation As per Court Permnission
Toyotsu Machinary & Engineering Bangladesh Limited
Work Details and Schedule for MOA Change
Note: Cost may change as per Authority demand.